ACCURATE SOLUTIONS
A quick and accurate means to estimate dimensions of a commercial
space during a site inspection would be to _____?
- Count the number of ceiling tiles in a drop tile installation
- Pace off number of steps across the room using an average of 3' (1m)
per step
- Utilize your arm span to measure the walls using an average of 5' 6"
(1.5m)
- Estimate based upon the number of fire sprinklers - Precise Answer
✔✔Count the number of ceiling tiles in a drop tile installation
A client requires a new boardroom. The sales person and engineer are
sent to the premises to survey the facility and discuss the opportunity
with the client. This process is best described as a ____
- Cost Analysis
- Functional Analysis
,- Needs Analysis
- Control Analysis - Precise Answer ✔✔Needs Analysis
When designing a client's new training room, the MOST important
information would come from the
- client's checklist of preferred equipment
- end-user descriptions of how the room will be utilized
- architectural drawings of the building
- feedback from the benchmarking site visit - Precise Answer ✔✔end-
user descriptions of how the room will be utilized
When establishing initial contact with a client, try to develop a
relationship early on with the:
- Chief operating officer
- Information technology manager
,- Stakeholders
- Purchasing manager - Precise Answer ✔✔Stakeholders
When creating an AV solution for a client, the first step should be
- creating a quote
- Proposing a technology
- reviewing existing infrastructure
- Gathering application requirements - Precise Answer ✔✔Gathering
application requirements
AV professionals determine the end user's needs by examining three
things: the required applications, the tasks, and the:
- Overall design concept
- Budget
- Technologies
- Functions to support the applications - Precise Answer ✔✔Functions
to support the applications
, What is the BEST way to determine how reverberant a space is?
- Clap your hands and listen for an echo
- Ask the client if anyone has complained that the room is too noisy
- Use an RT60 meter
- Use a DB SPL meter - Precise Answer ✔✔Use an RT60 meter
__ is the process of examining methods, techniques, and principles from
peer organizations and facilities.
- Schematic Design
- Punching a system
- Benchmarking
-Schematic Design - Precise Answer ✔✔Benchmarking
When working with a client what should be AVOIDED to ensure that
you are communicating effectively?
- Using diagrams and drawings as a reference
- Industry slang terms and jargon
- Plain language
- Demonstrating abstract concepts with real life examples - Precise
Answer ✔✔Industry slang terms and jargon