100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PCM STUDY QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
02-10-2024
Written in
2024/2025

PCM STUDY QUESTIONS AND ANSWERS

Institution
PCM
Course
PCM









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PCM
Course
PCM

Document information

Uploaded on
October 2, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PCM - PRACTICE QUESTIONS AND ANSWERS
What must an architect posses to pursue reciprocal licensure in another state? -
Answers-An NCARB certificate is sufficient and some states require additional testing

Why would an architect avoid the phrase "with the highest standards" in a contract? -
Answers-An architect's liability may increase or the professional work may be
uninsurable

How does public relations differ from marketing? - Answers-This kind of firm promotion
is not project-centric.

What are the five most important changes made to the 1909 American Institute of
Architect's Code of Ethics? - Answers--Compete for projects on the basis of fee
advertise, -Replace another architect on a project
-Engage in design-build projects
-Offer free design services to secure a commission

What is the purpose of an Employer Identification Number (EIN)? - Answers-It is
assigned by the Internal Revenue Service and is used for filing taxes and
communicating with the IRS.

What are the other names for professional liability insurance? - Answers-The terms
Malpractice Insurance and Errors and Omissions are often substituted

What are the implied duties of an architect? - Answers--Cooperating with contractors
-Assisting the owner in coordinating the work
-Not interfering with the contractor's work
-Giving relevant information to contractors

What are the four steps to make sure the firm's accounts receivable are being paid in a
timely manner? - Answers--Contract terms
-Timely billing
-Complete invoices
-Regular procedures for tracking accounts

If a firm pays an employee 50 dollars per hour and the net multiplier of that firm is 3,
what is the billing rate for that employee? - Answers-A billing rate of 150 dollars would
be determined by what combination of figures if the employee is paid 50 dollars per
hour.

What, if any, insurance is the owner obligated to have according to the AIA document
A201 General Conditions of the Contract for Construction? - Answers--Liability
Insurance
-Property Insurance
-Boiler and machinery insurance

, What are the three commonly used, viable defenses when an architect is sued for
liability and/or negligence? - Answers--Betterment
-Statute of limitations
-Statute of repose

The owner of an architecture firm might manage firm overhead by controlling what
specific consts? - Answers--Non-billable labor
-Non-labor direct expences
-Outsourced expenses
-Postage and delivery
-Local travel expenses
-Presentation materials

What does it imply if a firm is carrying a bill for longer than 90 days? - Answers-The firm
is effectively loaning money interest-free if this is happening

What is the main advantage of a studio office organization versus a departmental office
organization? - Answers-This form of firm organization provides the best opportunity for
group problem-solving.

What is an overhead rate? - Answers-This ratio of total office overhead to total direct
labor determines this measure of financial strength of an office.

What are the two types of accounting used in an architectural firm? - Answers-General
ledger and project cost are used for this purpose in an architecture firm.

Balance sheets are used to show what elements of the financial condition of a firm? -
Answers-These are summaries of all assets and liabilities in an office.

What is the accounting term for a bill to the firm for office supplies? - Answers-A liability
in this part of the firms accounting.

What does the net profit before tax include? - Answers-Total annual revenue minus
consultant fees and reimbursable expenses are part of this number.

What is the concept of privity? - Answers-As defined in the American Institute of
Architects document !201, General Conditions of the Contract for Construction this is
the term that holds architects harmless from claims by parties with whom they have no
direct contract.

What are the four levels of LEED certification? - Answers--Certified
-Silver
-Gold
-Platinum

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
1997
Member since
3 year
Number of followers
1444
Documents
46506
Last sold
1 day ago

3.8

341 reviews

5
169
4
61
3
44
2
16
1
51

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions