100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

MCPPO DESIGN AND CONSTRUCTION EXAM QUESTIONS WITH 100% VERIFIED ANSWERS

Rating
-
Sold
-
Pages
27
Uploaded on
27-09-2024
Written in
2024/2025

MCPPO DESIGN AND CONSTRUCTION EXAM QUESTIONS WITH 100% VERIFIED ANSWERS ...

Institution
MCPPO DESIGN AND CONSTRUCTION
Course
MCPPO DESIGN AND CONSTRUCTION










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MCPPO DESIGN AND CONSTRUCTION
Course
MCPPO DESIGN AND CONSTRUCTION

Document information

Uploaded on
September 27, 2024
Number of pages
27
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown

Subjects

  • mcppo
  • mcppo design

Content preview

MCPPO DESIGN AND CONSTRUCTION
EXAM QUESTIONS WITH 100%
VERIFIED ANSWERS 2024-2025

The three steps of the design and construction process for public construction
projects in Massachusetts are: planning, design, and construction.

What does the design stage yield? - ANSWER A comprehensive set of plans
and specifications for the project to be built.

What happens once a set of plans and specifications are completed? - ANSWER
Bids are solicited for the final design, and the chosen contractor completes the
building stage.

Who is always accountable for the project? - ANSWER: Public Owner
(Awarding Authority

Before contracting for design services with a public building contract for $1.5
million or more, your jurisdiction must undertake what? - ANSWER Work with
or assign an Owner's Project Manager (OPM).

Serves as your jurisdiction's agent for construction planning, design, and
implementation. - ANSWER OPM

Independent of the project's designer, general contractor, or any subcontractor. -
ANSWER OPM

What steps must you take if you decide to hire an OPM? - ANSWER: Use a
qualifications-based selection procedure, which means that the OPM must be
competitively selected based on qualifications rather than price.

Can you designate an employee to act as OPM? - ANSWER Yes, if the
employee fulfils or exceeds the requirements and has building construction and
supervision experience with projects of comparable scale and breadth of
complexity.

,What constitutes a study? - ANSWER A pre-design document which:

-Confirms and clarifies the owner's expectations.

- Identifies and assesses alternative alternatives.

-Suggests and defines a solution.

The purpose is to identify the owner's needs and select the most appropriate and
cost-effective solution to meet those demands. ANSWER Study


True or false: A study does not necessarily lead to a construction project. - The
answer is true.


More refined and detailed than the conceptual drawings used in the study.
Contains floor plans, side views, and other images. - ANSWER Schematic
Drawings


After this phase, the designer should produce and present to the owner a revised
construction cost estimate. - ANSWER Schematic Design Stage


Plans and specifications that are 10 to 30 percent complete. presented to the
owner as a deliverable. - ANSWER Schematic Design


Once the owner has approved the schematic design documents, the project may
move to this step.... - Answer Design Development


In this phase, the designer refines the drawings and textual specifications by
adding construction details and making adjustments based on the owner's
examination of the schematic design, as well as revisions necessary by a
regulatory agency. - Answer Design Development

, In this step, the design will be finished by filling in the final details—ANSWER
Construction Documents.




This design phase's product will be fully completed design documents that will
serve as the legal basis for the construction contract. - ANSWER Construction
documents.


Material specifications must be written to ensure full competition for each item
of material to be delivered under the contract.

Specifications that limit competition to fewer than three manufacturers or
producers may only be adopted for ___________________________ -
ANSWER "Sound Reasons in the Public Interest"


If you employ tight or proprietary specs for an item, the specifications must
include a "Or Equal" clause.


A clause permitting bidders to provide things that are equivalent to the specified
item. - Answer "Or Equal" Clause


For each item in the materials specification, the specs must name
_____________________ - ANSWER - A minimum of three brands of
materials or a material description that can be met by at least three
manufacturers or producers.


What measures should the owner take prior to soliciting submissions for design
services for construction and public works projects? - ANSWER: Develop a
comprehensive and detailed scope of work.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
luzlinkuz Chamberlain University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1426
Member since
4 year
Number of followers
849
Documents
27638
Last sold
2 days ago

3.7

303 reviews

5
131
4
61
3
54
2
17
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions