FDOT Final Estimates Level 1 Questions and Answers 100% Correct |

Institution
FDOT
Course
FDOT










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT
Course
FDOT

Document information

Uploaded on
September 26, 2024
Number of pages
25
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • fdot final

Content preview

FDOT Final Estimates Level 1 Questions and Answers
100% Correct | 2024-2025
T/F: A major function of the DOT is to carry out Construction and Reconstruction
programs to provide the public with adequate transportation service. -
ANSWER True


For DOT management of construction and reconstruction projects includes the
following specific responsibilities:
A. Planning, Programming, and Design
B. Contract Administrations
C. Contractor Payments
D. Design and Contract Management

E. All of the above - ANSWER E. All of the above


T/F: To pay for work performed by contractors, progress and Final Estimates are
needed? - ANSWER True


Which of the following is not officially considered a "Contract Document"?
A. Supplemental Agreements and Work Orders
B. Notebooks and Estimates Procedure Manual.
C. Standard Specifications.
D .Construction Manual.

E. Answers B & D. - ANSWER E. Answers B & D.

,Between printings of the Standard Specifications, what does the Department
publish to identify and describe changes in the Specifications?
A. CPAM
B. Supplemental Specifications
C. Work Orders

D. Specification Changes - ANSWER B. Supplemental Specifications


Select the correct sequence of documents in order of precedence, with the
document highest in authority listed first.
A. Contract Plans, Development Specifications, Standard Specifications, Special
Provisions, Technical Special Provisions, Supplemental Specifications, Design
Standards.
B. Design Standards, Special Provisions, Technical Special Provisions, Supplemental
Specifications, Contract Plans, development Specifications, Standard
Specifications.
C. Special Provisions, Technical Special Provisions, Contract Plans, Design
Standards, Development Specifications, Supplemental Specifications, Standard
Specifications.
D. Supplemental Specifications, Special Provisions, Contract Plans, Development
Specifications, Standards Specifications, Technical Special Provisions, Design
Standards.

E. None of the above. - ANSWER C. Special Provisions, Technical Special
Provisions, Contract Plans, Design Standards, Development Specifications,
Supplemental Specifications, Standard Specifications.


True or False. When checked and verified, final estimates serve as the basis for
Final Payment. - ANSWER True

, Which of the following sets for the Department's methods and Procedures for
preparing and checking final estimates?


A. Construction Inspection Mathematics
B. Project Engineer
C. Preparation and Documentation Manual

D. CPAM - ANSWER C. Preparation and Documentation Manual


Please match the appropriate documentation name with the correct description
below:
A. [Final Plans]: For reviewing contract time charges before clearing estimates for
final payment; [Computation Books]: Documents pertinent changes during
construction and show the "as-built' condition; [Field Books]: Contains alignment
notes and cross section notes, etc.
B. [Construction Diaries]: For reviewing contract time charges before clearing
estimates for final payment; [Final Plans]: Documents pertinent changes during
construction and show the "as-built' conditions; [Field Books]: Contains alignment
notes and cross section notes, etc.
C. [Final Plans]: For reviewing contract time charges before clearing estimates for
final payment; [Tabulation Forms]: Documents pertinent changes during
construction and show the "as-built' conditions; [Field Books]: Contains alignment
notes and cross section notes, etc.

D. [Final Plans]: For r - ANSWER B. [Construction Diaries]: For reviewing
contract time charges before clearing estimates for final payment; [Final Plans]:
Documents pertinent changes during construction and show the "as-built'
conditions; [Field Books]: Contains alignment notes and cross section notes, etc.


When using calculators or computers, you should use the:

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudySet Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2569
Member since
5 year
Number of followers
1735
Documents
17158
Last sold
1 day ago
STUDYSET WILL HELP YOU EARN A TOP SCORE ON YOUR EXAMS

avoid resits and achieve higher grades with Aplus satisfying exams,study guide,class notes and textbook notes

4.0

609 reviews

5
313
4
107
3
99
2
26
1
64

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions