The large-scale adoption of the business computer led to a new form of drafting called ___.
Select one:
a.Building Information Modeling (BIM)
b.Computer-Aided Drafting (CAD)
c.BlueBeam
d.DesignCAD - ANSWER-b.
Computer-Aided Drafting (CAD)
Prints are drawn to a scale. Electricians use a(n) ___ scale when reading and determining measurements
on a print.
Select one:
a.architectural
b.digital
c.engineering
d.ratio - ANSWER-
Which MasterFormat® Division is used for electrical specifications?
Select one:
a.Division 26
b.Division 01
c.Division 14
d.Division 44 - ANSWER-a.
Division 26
,RFP is the acronym for ___.
Select one:
a.Request for Proposal
b.Request for Personnel
c.Request for Products
d.Request for Pricing - ANSWER-d.
Request for Pricing
Which schedule is the most important for the electrician?
Select one:
a.the finish schedule
b.the panel schedule
c.the fixture schedule
d.the power schedule - ANSWER-b.
the panel schedule
The ___ plan shows location of lighting fixtures and other equipment, such as air-handling diffusers,
smoke detectors, or sprinkler heads.
Select one:
a.lighting
b.power
c.one-line / riser diagram
d.reflected ceiling plan - ANSWER-
The ___ is an isometric view of the distribution system to install from.
Select one:
a.power plan
b.structural plan
,c.one-line / riser diagram
d.general plan - ANSWER-c.
one-line / riser diagram
It is also important to read the ___ plan to determine where an electrical installation may be required,
such as how close to install a receptacle near a sink.
Select one:
a.structural
b.general
c.lighting
d.mechanical and plumbing - ANSWER-
___ are commonly shown on all drawings to provide basic information such as general references, tasks
to be performed, or code conformity.
Select one:
a.General Notes
b.Key Notes
c.Special Notes
d.Information Notes - ANSWER-a.
General Notes
The ___ plan shows the compass direction of the building.
Select one:
a.floor
b.elevation
c.compass
d.plot - ANSWER-d.
plot
, The project delivery method where the owner works with the architect/engineers directly at project
start is ___.
Select one:
a.design-bid/build
b.design-build
c.time and material
d.build-design - ANSWER-a.
design-bid/build
The project delivery method where the GC is responsible for much of the design is ___.
Select one:
a.design-bid/build
b.design-build
c.time and material
d.build-design - ANSWER-
The project delivery method used for change orders or small projects is ___.
Select one:
a.design-bid/build
b.design-build
c.time and material
d.build-design - ANSWER-
RFP typically means ___.
Select one:
a.reinforced partition
b.rounded furniture post
c.request from plumber
d.request for pricing/proposal - ANSWER-d.