100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CTS Exam Prep Questions and Correct Answers | Latest Update

Rating
-
Sold
-
Pages
58
Grade
A+
Uploaded on
19-09-2024
Written in
2024/2025

What are the four teams that comprise the overall Project Team? -:- Owner, Design, Installation, and Management Who would belong to the Design team? -:- Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? -:- Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? -:- Owner Which group represent the generic roles that are important to the Project process? -:- Project Managers, Designers and Installers 2 | P a g e | G r a d e A + | 2 0 2 4 / 2 0 2 5 Excel! 2 0 2 4 /2025 | © copyright | This work may not be copied for profit gain Which project characteristics must be considered in order to determine which method is best suited for a particular project? -:- Schedule, Size, Type, Complexity, and Procurement Requirements What is an important aspect of funding that has a direct impact on the project process and design/installation? -:- Technical Support Funding Whether a construction project is large or small, which milestones must be achieved in a typical schedule? -:- Programming, Building Design, AV Bid, and Move -In What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? -:- Long term projects with extended project cycles What is the risk in using an OFE/Integrator Installed contract structure? -:- System and infrastructure design and facility functionality may suffer 3 | P a g e | G r a d e A + | 2 0 2 4 / 2 0 2 5 Excel! 2 0 2 4 /2025 | © copyright | This work may not be copied for profit gain What are some of the im

Show more Read less
Institution
CTS
Course
CTS











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CTS
Course
CTS

Document information

Uploaded on
September 19, 2024
Number of pages
58
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

2024 /2025 | © copyright | This work may not be copied for profit gain Excel!




CTS Exam Prep Questions and Correct
Answers | Latest Update
What are the four teams that comprise the overall Project Team?


✓ -:- Owner, Design, Installation, and Management




Who would belong to the Design team?


✓ -:- Anyone with Consultant in their title except the moving consultant




Which groups make up the Management Team?


✓ -:- Developer, Construction Manager, and Building Management Agency




The End-User, Facility Manager and Building Committee comprise which team within the

Project Team?


✓ -:- Owner




Which group represent the generic roles that are important to the Project process?


✓ -:- Project Managers, Designers and Installers




1|P a g e | G r a d e A + | 2 0 2 0 2 5

,2024 /2025 | © copyright | This work may not be copied for profit gain Excel!



Which project characteristics must be considered in order to determine which method is

best suited for a particular project?


✓ -:- Schedule, Size, Type, Complexity, and Procurement Requirements




What is an important aspect of funding that has a direct impact on the project process and

design/installation?


✓ -:- Technical Support Funding




Whether a construction project is large or small, which milestones must be achieved in a

typical schedule?


✓ -:- Programming, Building Design, AV Bid, and Move -In




What type of project is a typical Consultant-Led Design-Bid-Build contract structure good

for?


✓ -:- Long term projects with extended project cycles




What is the risk in using an OFE/Integrator Installed contract structure?


✓ -:- System and infrastructure design and facility functionality may suffer



2|P a g e | G r a d e A + | 2 0 2 0 2 5

,2024 /2025 | © copyright | This work may not be copied for profit gain Excel!




What are some of the important project scope and size considerations in selecting an AV

provider?


✓ -:- Financial Stability, Current Workload, and Company Credentials




What type of document typically includes Project Size Requirements, Corporate Profile,

Team Personnel, and Warranty Response Time?


✓ -:- RFQ




a significant difference between the Two-Envelope Bid


Method and the Qualifications- Based Selection Method?


✓ -:- Negotiate with the highest ranking firm to finalize the contract




What is one of the disadvantages of contracting the AV integrator to the electrical


subcontractor?


✓ -:- More layers of responsibility and communication




3|P a g e | G r a d e A + | 2 0 2 0 2 5

, 2024 /2025 | © copyright | This work may not be copied for profit gain Excel!



When conducting a complete project bid process, what milestone follows the issuing of the

RFP?


✓ -:- Pre-Bid Meeting




Under what circumstances would you likely use an A305-1986 form?


✓ -:- Scoring responses to an RFQ




What is the ideal way to contract an AV integrator?


✓ -:- Directly to the Owner




The process of identifying the activities that end-users need to perform, and developing the

functional descriptions of your systems is referred to as:?


✓ -:- Needs Analysis




What is the main task of the third Step of the Program Phase of a Project?


✓ -:- Conducting program meetings




What should be included in the written Program Report?

4|P a g e | G r a d e A + | 2 0 2 0 2 5

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Guru01 Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
216
Member since
1 year
Number of followers
32
Documents
20945
Last sold
1 week ago

3.8

36 reviews

5
15
4
8
3
7
2
1
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions