questions with 100% correct
answers
DBIA Mission - answer Promotes the value of design-build project
delivery and teaches the effective integration of design and
construction services to ensure success for Owners and design and
construction practitioners
DBIA Values - answer - Excellence in integrated design-build project
delivery, producing high value outcomes. - An environment of trust
characterized by integrity and honest communication. - mutual
respect for diverse perspectives. - commitment to innovation and
creativity to drive quality, value and sustainability. -
Professionalism, fairness and the highest level of ethical behavior.
DBIA Vision - answer Be the industry's preeminent resource for
leadership, education, objective expertise and best practice for the
successful integrated delivery of capital projects.
DBIA Purpose - answer Only organization that defines, teaches, and
promotes best practice in design-build project delivery.
Best practices - answer the belief that there is a technique, method,
or process that is more effective at delivering a particular outcome
than any other method
Design-Build Done RIght - answer Categorized 10 best practice
supporting implementing techniques into 3 areas
, 3 areas of best practices from Design build done right - answer 1.
Procuring design-build services 2. contracting for design-build
services 3. executing the delivery of design-build projects
Design build best practice #1 - answer All team members should be
educated and trained in the design build process and delivery
system
Key factors enabling team alignment - answer Early involvement,
qualifications-based selection, cost transparency, fostering an
environment of trust
Core team - answer Owner, lead design-builder, key specialty
contractors, design and engineering professionals
post award - answer The time from Notice of Award to the end of
the warranty period
action steps in early involvement - answer create project specific
goals, 1-3 page documents for DBIA critical issues, core principals
addressed in each position paper
owner - answer who sets the tone for the project and is responsible
for an integrated and collaborative environment
design excellence goal - answer may include memorable design,
state of the art structure/facility, sustainability and energy
efficiency, holistic consideration of context, size and environment
integrated design and construction work plan - answer task that
includes all parties to get the project done in an integrated way
designer of record - answer leads design effort