Independent Demand correct answers Demand for items that are considered end items that go directly to a customer, and for which demand is influenced by market conditions and not related to inventory decisions for another item. Dependent Demand correct answers Demand for items that are used to make another item or are considered to be parts of another item. MRP (Material Requirements Planning) correct answers A computer-based system that develops plans for ordering and producing dependent demand items. MRP (Two Basic Principles) correct answers 1. Requirements for dependent demand items are derived from the production schedule for their parents (the items that are assembled from component parts). 2. The production order is offset to account for the lead time. MRP II correct answers Links production planning and inventory with a company's financial and accounting systems. Evolved to become ERP (enterprise resource planning) which integrates all functional areas of a business. Material Requirements Plan correct answers Plan that specifies the timing and size of new production orders, adjustments to existing order quantities, and expediting or delay of late/early orders. MRP Explosion correct answers A technique for converting the requirements of final products into a material requirements plan that specifies the production/order quantities and timing for all subassemblies, components, and raw materials needed by final products. Master Schedule correct answers A document that details the quantity of end items to be produced within a specified period of time Objectives: - MS must balance workload for total capacity, capacity at each workstation, and for each worker. - MS seeks to minimize total cost/providing delivery dates for accepted orders. - Planned production quantities in MS satisfies demand, estimated based on forecasts. - MS should be frozen or unchangeable in near term, slightly changeable in middle term, very changeable in long term. Key Aspects of MS correct answers - The sums of the quantities in the MS must equal those in the aggregate production plan.

Show more Read less
Institution
MGT 301 Chapter 12
Course
MGT 301 Chapter 12









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MGT 301 Chapter 12
Course
MGT 301 Chapter 12

Document information

Uploaded on
September 12, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

MGT 301 Chapter 12 || with Complete Solutions.
Independent Demand correct answers Demand for items that are considered end items that go
directly to a customer, and for which demand is influenced by market conditions and not related
to inventory decisions for another item.

Dependent Demand correct answers Demand for items that are used to make another item or are
considered to be parts of another item.

MRP (Material Requirements Planning) correct answers A computer-based system that develops
plans for ordering and producing dependent demand items.

MRP (Two Basic Principles) correct answers 1. Requirements for dependent demand items are
derived from the production schedule for their parents (the items that are assembled from
component parts).

2. The production order is offset to account for the lead time.

MRP II correct answers Links production planning and inventory with a company's financial and
accounting systems.

Evolved to become ERP (enterprise resource planning) which integrates all functional areas of a
business.

Material Requirements Plan correct answers Plan that specifies the timing and size of new
production orders, adjustments to existing order quantities, and expediting or delay of late/early
orders.

MRP Explosion correct answers A technique for converting the requirements of final products
into a material requirements plan that specifies the production/order quantities and timing for all
subassemblies, components, and raw materials needed by final products.

Master Schedule correct answers A document that details the quantity of end items to be
produced within a specified period of time

Objectives:
- MS must balance workload for total capacity, capacity at each workstation, and for each
worker.
- MS seeks to minimize total cost/providing delivery dates for accepted orders.
- Planned production quantities in MS satisfies demand, estimated based on forecasts.
- MS should be frozen or unchangeable in near term, slightly changeable in middle term, very
changeable in long term.

Key Aspects of MS correct answers - The sums of the quantities in the MS must equal those in
the aggregate production plan.

, - Aggregate production quantities should be planned efficiently over time in order to minimize
setup, production, and inventory costs.
- Capacity limitations must be considered before finalizing the MS, including labor and machine
capacity, storage space, transportation equipment, and other factors.

Bill of Materials correct answers - A document that specifies all assemblies, subassemblies,
parts, and raw materials that are required to produce one unit of the finished product.
- Hierarchical in nature, with the finished product at the top and each lower level showing how
many of each type of part or subassembly are needed to produce one unit of the parent item.
- Often represented in visual form by a product structure tree.

Inventory Record correct answers A document that specifies order/lot size policy and lead time
and records all transactions made for parts, assemblies, and components.

Includes transactions both from manufacturing within an organization and from purchasing items
from external suppliers.

Inventory Transaction correct answers Any change in the quantity of a specific part or material.

Planning Factors correct answers Three parameters -- lot size, lead time, and safety stock -- that
are chosen by managers utilizing the MRP system

Lot Size correct answers The quantity of a part to be produced or ordered when additional
inventory is required

Lead Time correct answers The time between when an order is place and when it is expected to
arrive or be finished

Safety Stock correct answers Excess inventory that a company holds to guard against uncertainty
in demand, lead time, and supply

Time Buckets correct answers The periods of time into which an MRP record is divided

Planning Horizon correct answers The time period in the future that the MRP system plans for

Beginning Inventory correct answers The amount of inventory that was physically in stock at the
end of the most recent time bucket

Gross Requirements correct answers The total number of units of a part or material derived from
all parent production plans

Scheduled Receipts correct answers Orders that have been placed but not yet received or
completed

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FullyFocus NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
View profile
Follow You need to be logged in order to follow users or courses
Sold
734
Member since
3 year
Number of followers
437
Documents
34567
Last sold
1 week ago
Reign Supreme Scholarly || Enlightened.

Here we offer revised study materials to elevate your educational outcomes. We have verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. We are dedicated to offering you the best services and you are encouraged to inquire further assistance from our end if need be. Having a wide knowledge in Nursing, trust us to take care of your Academic materials and your remaining duty will just be to Excel. Remember to give us a review, it is key for us to understand our clients satisfaction. We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Read more Read less
3.7

110 reviews

5
46
4
20
3
22
2
8
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions