100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CTS Exam Prep Questions and Answers

Rating
-
Sold
-
Pages
26
Grade
A+
Uploaded on
29-08-2024
Written in
2024/2025

CTS Exam Prep Questions and Answers

Institution
CTS
Course
CTS










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CTS
Course
CTS

Document information

Uploaded on
August 29, 2024
Number of pages
26
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CTS Exam Prep




What are the four teams that comprise the overall Project Team? - Answer -Owner, Design, Installation,
and Management



Who would belong to the Design team? - Answer -Anyone with Consultant in their title except the
moving consultant



Which groups make up the Management Team? - Answer -Developer, Construction Manager, and
Building Management Agency



The End-User, Facility Manager and Building Committee comprise which team within the Project Team?
- Answer -Owner



Which group represent the generic roles that are important to the Project process? - Answer -Project
Managers, Designers and Installers



Which project characteristics must be considered in order to determine which method is best suited for
a particular project? - Answer -Schedule, Size, Type, Complexity, and Procurement Requirements



What is an important aspect of funding that has a direct impact on the project process and
design/installation? - Answer -Technical Support Funding

,Whether a construction project is large or small, which milestones must be achieved in a typical
schedule? - Answer -Programming, Building Design, AV Bid, and Move-In



What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - Answer -
Long term projects with extended project cycles



What is the risk in using an OFE/Integrator Installed contract structure? - Answer -System and
infrastructure design and facility functionality may suffer



What are some of the important project scope and size considerations in selecting an AV provider? -
Answer -Financial Stability, Current Workload, and Company Credentials



What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel,
and Warranty Response Time? - Answer -RFQ



a significant difference between the Two-Envelope Bid

Method and the Qualifications- Based Selection Method? - Answer -Negotiate with the highest ranking
firm to finalize the contract



What is one of the disadvantages of contracting the AV integrator to the electrical

subcontractor? - Answer -More layers of responsibility and communication



When conducting a complete project bid process, what milestone follows the issuing of the RFP? -
Answer -Pre-Bid Meeting



Under what circumstances would you likely use an A305-1986 form? - Answer -Scoring responses to an
RFQ



What is the ideal way to contract an AV integrator? - Answer -Directly to the Owner



The process of identifying the activities that end-users need to perform, and developing the functional
descriptions of your systems is referred to as:? - Answer -Needs Analysis

, What is the main task of the third Step of the Program Phase of a Project? - Answer -Conducting
program meetings



What should be included in the written Program Report? - Answer -...A conceptual and functional
system description



The more accurate means to estimate dimensions of a commercial space during a site inspection would
be to? - Answer -Count Ceiling Tiles in a drop tile instalation



A client requires a new boardroom. The sales person and engineer are sent to the premises to measure
the facility and talk to the client. At this stage they should be performing a _ - Answer -Needs Analysis



Sightlines for audience viewing in a given presentation space can be improved by: - Answer -Providing a
sloped, or stepped, seating arrangement



After presenting a proposal, what is the correct plan of action for following up with the client? - Answer -
Regularly, until a decision is made



AV professionals determine the end user's needs by examining three things: the required applications,
the tasks, and the: - Answer -Functions to support the applications



When working with a client to design an AV solution for a new conference center, the client requests a
detailed budget for the equipment and installation. What phase is the project in? - Answer -Design
phase



The HDTV aspect ratio is equal to which of the following? - Answer -1.78:1



Please select the appropriate resolution for SXGA. - Answer -1280 x 1024



The Brightness control adjusts which level? - Answer -Black Level

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Zanaya Arizona College Of Allied Health
View profile
Follow You need to be logged in order to follow users or courses
Sold
70
Member since
2 year
Number of followers
28
Documents
9676
Last sold
2 weeks ago

4.5

12 reviews

5
8
4
2
3
2
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions