100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

MNO2603 Assignment 3 Semester 2 2024 - DUE 10 September 2024

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
28-08-2024
Written in
2024/2025

QUESTIONS WITH ANSWERS MNO2603 Assignment 3 Semester 2 2024 - DUE 10 September 2024

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Course

Document information

Uploaded on
August 28, 2024
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

[Date]



MNO2603 Assignment 3
Semester 2 2024 - DUE
10 September 2024
QUESTIONS WITH COMPLETE ANSWERS

, MNO2603 Assignment 3 Semester 2 2024 - DUE 10 September 2024



In Focus:

What the Charlotte Maxeke fire tells us about health and safety in Gauteng
hospitals Just weeks before a fire tore through parts of Charlotte Maxeke
Hospital in Johannesburg on 16 April, a fire safety audit at the hospital was
signed off and in March a hospital fire and safety team met, according to
the Gauteng Department of Health. Yet Kwara Kekana, spokesperson for
Gauteng Health also confirmed in responses to questions from Spotlight
that “the smoke doors are not used as the magnetic system on the doors
was no longer effective and they were recommissioned”. Smoke doors are
used to prevent the spread of smoke in a building when there is a fire. She
also confirmed that fire hydrant couplings were not compatible with the fire
hoses on Johannesburg Fire Service fire engines because “some had been
stolen”. Spotlight has requested, but not received a copy of the fire audit/
inspection report from the Gauteng Health Department, the Department of
Infrastructure and Development, and the City of Joburg’s Fire Services.
Fire compliance failures Two senior firefighters from the City of
Johannesburg who spoke to Spotlight, say the two failings (mentioned by
Kekana above) alone would sink a basic inspection or compliance audit. It
was also not just the fire doors and the hydrant couplings that were faulty at
Charlotte Maxeke. They say firefighters were not given building and floor
plans of the hospital’s emergency exit plan when they arrived on the scene
the day of the fire on April 16. The emergency exit plan is essential for
those needing to enter a burning building. Smoke detection systems, fire
alarms, sprinkler systems, and the mechanisms that would have triggered

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QuizDoc Chamberlain College Of Nursng
Follow You need to be logged in order to follow users or courses
Sold
226
Member since
2 year
Number of followers
193
Documents
1051
Last sold
2 months ago

3.7

31 reviews

5
13
4
4
3
10
2
0
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions