100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Icc 2024 international zoning code (izc) questions and verified answers () a+

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
26-08-2024
Written in
2024/2025

Icc 2024 international zoning code (izc) questions and verified answers () a+

Institution
ICC
Course
ICC








Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
August 26, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Icc 2024 international zoning code (izc) questions and verified answers (202
2025) a+

1. State regulated storm water management was initiated by the states' desire
to participate in the national ____________________ Program.: Flood
Insurance (ch. 4, p22)
2. When an attorney brings up in trial another court's decision this is called
___________________.: common law ( ch. 5, p 26)
3. The members of the Board of Building Code Appeals shall be appointed by
the _____________________.: governing body (ch. 7, p 52)
4. A ____________________ must frequently be published in the local
newspaper of general circulation when a building code is being proposeed
for adoption.: notice of intent (ch. 3, p 15)
5. A power which has been "set forth and declared exactly" is known as
________________________ power.: expressed (ch. 3, p 12)
6. The requirements that mandates federal design standards for the new
housing containing four or more units is known as the
__________________.: FHA
(ch. 12, p 122)
7. ___________________ takes place when a community puts into place a plan
to revitalize depressed areas in that community.: Urban renewal (ch. 9, p 87) 8.
What is the most important document in the building code permit process?:
Permit Application (ch. 6, 32)
9. A county form government is usually considered a ________________.:
arm of the state (ch. 3, p 10)
10. A violation observed wile the building official is at a location where he or
she is legally entitle to be is admissible because of the _________________
doctrine.: plain view (ch. 8, p 65)
11. Certain legal procedures must be strictly followed when a building code
as any omission my result in ______________.: voidance of the entire building
code
(ch 3, p 16)
12. ___________________ powers either arise from powers expressly granted
or essential to the operation of the powers that are expressly granted.:
code official (ch. 3, 12)
13. When preparing a civil complaint the first decision that must be made is

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ScholarSphere Keiser University (Port Saint Lucie)
View profile
Follow You need to be logged in order to follow users or courses
Sold
103
Member since
1 year
Number of followers
15
Documents
2641
Last sold
8 hours ago
Premium Exam Elaborations for Global Learners

4.0

32 reviews

5
20
4
4
3
1
2
2
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions