100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

EXAC Study Cards Questions with Correct Answers.

Rating
-
Sold
-
Pages
89
Grade
A+
Uploaded on
17-08-2024
Written in
2024/2025

EXAC Study Cards Questions with Correct Answers.

Institution
Exac
Course
Exac











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Exac
Course
Exac

Document information

Uploaded on
August 17, 2024
Number of pages
89
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

EXAC Study Cards Questions with Correct Answers
How much liability insurance is an architect in Canada required to have?
Correct Answer-AIBC Bulletin 66, AIBC Bylaw 16.3 & Architect's Act
Depends on the province; in BC Architects are not required to have any
liability insurance according to AIBC Bylaw 16.2d but Bulletin 66
requires that (before entering into an agreement to provide architectural
services) a Certificate of Practice holder must notify the client in writing
whether or not professional liability insurance is held and under what
terms.
Section 24.2h in the Architect's Act states that an institute's bylaws may
or may not include requirements for liability insurance; in BC, there is
no requirement.


What resources are available to an architect to produce a project cost
estimate? Correct Answer-CHOP 2.3.3, Techniques


There are various types of cost consultants and/or resources available to
the architect to produce a reliable estimate if they do not have the
expertise or resources to produce one in-house.


Quantity Surveyors - provide professional service at hourly rates, or at a
fixed or percentage fee of the construction budget.


Construction Managers and other Development/Construction Experts -
Other sources of expertise directly from the construction industry
include construction managers, contractors, design-builders, and
developers.

,Construction Price Index - data usually published by government
agencies and private companies. These publications are useful only as a
guide to show trends; usually some months out-of-date; often presented
in graph form for ease of communication.


Publications - available from government agencies, private interest
groups, private companies, and quantity surveyors. The
information comes in printed or electronic form, and the cost varies
considerably depending on the amount of detail, completeness, and ease
of use. Data from government agencies are more useful for identifying
trends and differences in national, regional, and local costs than for
calculating the cost of a specific building.


What Factors influence construction cost? (12 answers... If you dare!)
Correct Answer-CHOP 2.3.3, Factors Affecting Cost


1. Type of project
2. Overhead
3. Profit
4. Market Conditions
5. Difficult Access
6. Fast schedule
7. Escalation/Inflation
8. Tax
9. Season and Weather

,10. Change in functional program
11. Contingency
12. Regulations


What are 3 different methods of construction estimation? Correct
Answer-CHOP 2.3.3, Methods of Preparing Cost Estimates &
Hanscomb Yardstick for Costing, 2004


1. Composite unit rates (broken into specification sections)
Uses very simplified historic data as a basis for calculating cost. Only
reliable if the historic data is comparable.


2. Gross building costs or area calculation (least accurate)
Cost per m2 or per ft2. Architects should limit the use of this basic
information by using it only as a general guide at the pre-design stage.


3. Elemental building costs (most comprehensive)
Quantity surveyors often use this method as the standard format for
presenting cost information. It divides the building into major elements
such as structure, exterior closure; and then applies relevant cost
information from similar projects.


What is the purpose of progressive release of holdbacks? Correct
Answer-This allows the release of holdbacks to subcontractors or
suppliers in advance of the substantial performance of the work.

, what are 5 examples of additional services not covered under RAIC
document 6? Correct Answer-1. feasibility studies
2. business cases
3. functional programming
4. submissions to authorities
5. life cycle cost studies


what are 3 advantages of water heating distribution systems? Correct
Answer-1. compact, easily hidden
2. can be combined with domestic hot water systems
3. good for radiant floor heating.


what are 4 advantages of electric heating systems? Correct Answer-1.
most compact
2. quick response to temperature changes
3. easily zoned
4. low initial cost


What are three advantages of air heat distribution? Correct Answer-
1.quick response
2.can also perform ventilation, cooling, humidity control and filtering.
3. no equipment in rooms


What buildings require the services of an architect? Correct Answer-
AIBC Bulletin 31

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2022
Member since
3 year
Number of followers
1344
Documents
47128
Last sold
6 days ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

369 reviews

5
162
4
84
3
52
2
22
1
49

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions