100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CEM FINAL EXAM QUESTIONS AND ANSWERS WITH SOLUTIONS 2024

Rating
-
Sold
1
Pages
18
Grade
A+
Uploaded on
15-08-2024
Written in
2024/2025

CEM FINAL EXAM QUESTIONS AND ANSWERS WITH SOLUTIONS 2024

Institution
CEM
Course
CEM










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CEM
Course
CEM

Document information

Uploaded on
August 15, 2024
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CEM FINAL EXAM QUESTIONS AND
ANSWERS WITH SOLUTIONS 2024
Phases in a Project Cycle - ANSWER Need, Programming, Schematic Design, Detailed Design,
Construction Documents, Bid, Construction, Operation & Maintenance, Decommission



Sectors of the Construction Industry - ANSWER Industrial, Heavy civil, Building, Residential



Industrial Construction - ANSWER 5-10% ex: gasoline



Heavy Construction - ANSWER 20-25% ex: roads, I-85



Building Construction - ANSWER 35-40% ex: hospitals, schools



Residential Construction - ANSWER 30-30% ex: apartment, house, farm



Major Players in Construction - ANSWER Owners & Developers, Designers, Builders, Consultants



Construction Management - ANSWER Money, Materials, Machines and Manpower



LEED - ANSWER Leadership in Energy & Environmental Design.

Principles: Choose a sustainable site, maximize water efficiency, save energy, make smart material &
resource decisions and improve indoor air quality.



Level of Influence vs Cost Curves - ANSWER Influence of cost is greater at the beginning of the
construction process and decreases over time while cost increases over time.



What happened in the Hyatt collapse? - ANSWER Under-designed Box-Beam did not meet building
codes, constructability changes did not account for design intent and doubled load on an under-designed
box-beam, poor coordination/communication

,Types of Estimating - ANSWER AACE, RS Means, Bid Estimates, Control Estimates, and Halpin's et al.



AACE estimate - ANSWER Order of Magnitude: -30% to +50%

Budget: -15% to +30%

Definitive: -5% to 15%



RS Means Estimate - ANSWER Order of Magnitude: +-20%

Square Foot & Cubic Foot: +-15%

System: +-10%

Unit Price: +-5%



Bid Estimates - ANSWER Subcontractor quotations, Quantity takeoffs and construction procedures



Control Estimates - ANSWER a non-binding estimate of construction costs which can be used not only to
satisfy the Owner's need for requisitioning funds, but also as a control over the builder during trade
procurement.



Halpin's et al. - ANSWER conceptual estimate, preliminary estimate, engineer's estimate and bid
estimate; accuracy increases with each step.



Information available vs accuracy of bid - ANSWER as information increases accuracy increases



BCI - ANSWER Building Cost Index: takes into account skilled labor



CCI - ANSWER Construction Cost Index: takes into account common labor



Programming Phase - ANSWER Defines the owner's new construction needs, forms the basis for the
owner's expectations, the primary design reference for the development of the project. Program report
is developed.

, Schematic Design - ANSWER Demonstrate basic spaces, scale and relationship of components. Along
with a graphic illustration the designer also needs to explain in writing a narrative. Simple designs and a
project narrative are produced.



Detailed Design - ANSWER Detailed drawings produced, Code compliance, construction cost, project
schedule , LEED compliance report if applicable. Goal is to achieve a really polished product.



Construction Documents - ANSWER 100% submission is a complete, coordinated set of contract
documents composed of: Drawings and project scope.



Contract method of award - ANSWER competitive or negotiated



Contract method of pricing - ANSWER Fixed price or Cost type



Competitive Contracts - ANSWER Based upon qualifications, price, price+ time, price+ quality, price+
time + quality



Fixed Price Contracts - ANSWER Lump sum or Unit price



Reimbursable Contracts - ANSWER Cost plus or Guaranteed Maximum Price (GMP)



Contract Types - ANSWER Lump Sum, Unit Price, Cost Plus, Guaranteed Maximum Price (GMP)



Lump Sum Contract - ANSWER Contractor Assumes all of the risk.

Contractor quotes a single price for all work and services necessary for a project.

Advantage: Price Fixed in advance.

Disadvantage: Quality, contingencies, scope fully defined



Unit Price - ANSWER Owner assumes all of the risk

Breaks down the project into work items that are defined by units such as cubic yards, square feet, etc.
and prices are provided for these individual items.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Performance Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
314
Member since
1 year
Number of followers
36
Documents
15166
Last sold
1 day ago

Welcome To my Store My Goal is to help you achieve your desired grades by providing credible study materials I'm happy to help you with quality documents On this page you will find quality study guides, Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials . Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards Be assured to get good grades and always leave a review after a purchase Refer a friend SUCCESS!!!

Read more Read less
4.4

216 reviews

5
128
4
60
3
19
2
3
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions