Owner Builder UPDATED Exam Questions and CORRECT Answers At what depth of trench is shoring require / At what depth of an excavation is shoring required? - Correct Answer- 1.2 M or 4 Feet How can shoring be done past 4 feet? - Correct Answer- This can be done with purpose-built shoring, or, it is acceptable to use plywood if it is properly constructed. Which of the following is not an acceptable method for determining the correct grading for a trench? - Correct Answer- experienced contractor says it's ok Before a worker enters any excavation over 1.2 m (4 ft) in depth or, while in the excavation, approaches closer to the side or bank than a distance equal to the depth of the excavation, the employer must ensure that the

Show more Read less
Institution
Owner Builder
Course
Owner Builder










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Owner Builder
Course
Owner Builder

Document information

Uploaded on
August 15, 2024
Number of pages
29
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

Owner Builder UPDATED Exam Questions
and CORRECT Answers

At what depth of trench is shoring require / At what depth of an excavation is shoring
required? - Correct Answer- 1.2 M or 4 Feet


How can shoring be done past 4 feet? - Correct Answer- This can be done with purpose-built
shoring, or, it is acceptable to
use plywood if it is properly constructed.


Which of the following is not an acceptable method for determining the correct grading for a
trench? - Correct Answer- experienced contractor says it's ok


Before a worker enters any excavation over 1.2 m (4 ft) in depth or, while in the excavation,
approaches closer to the side or bank than a distance equal to the depth of the excavation, the
employer must ensure that the
sides of the excavation are - Correct Answer- (a) sloped as specified in writing by a qualified
registered professional,
(b) sloped at angles, dependent on soil conditions, which will ensure stable faces, but in no
case, may the slope or combination
of vertical cut and slope exceed that shown in Figure 20-1,
(c) benched as shown in Figure 20-2,
(d) supported as specified in writing by a professional engineer,
(e) supported in accordance with the minimum requirements of section 20.85, or
(f) supported by manufactured or prefabricated trench boxes or shoring cages, or other
effective means.


Which best describes the design principle of rain water deflection? - Correct Answer- Design
and construction which stops water from ever entering


What lighting certifications are required in Canada? - Correct Answer- CSA safety
certification

,What grit of sandpaper would get smoothest result? 150-180 etc. - Correct Answer- The
higher the grade, the smoother the finish. When finishing a surface, you typically start with a
low grit and
work up to a high grit.


What is the maximum rise in a flight of stairs?
a. The vertical height any flight stairs - Correct Answer- The vertical height shall not exceed
3.7 M


What is the minimum distance that a ladder must extend above a parapet wall or landing? -
Correct Answer- 3 feet


If you have a 4m ladder, how far from the wall does the base of the ladder have to be? -
Correct Answer- 74 degrees or 4:1 ratio. So 4 m ladder, needs to be 1 m away.


What heights are end dams to be on window and door flashings? - Correct Answer- 25 mm /
1 inch (from BCBC)


When to call for inspections and how to make them efficient as possible? - Correct Answer-
Group together when possible and call when work is complete


When is an HRV required? - Correct Answer- Almost always:
"Effective December ϭε, ϮϬϭκ residential dwelling units, such as houses, apartments and
secondary suites will be required to have
a principal ventilation system that exhausts air from bathrooms and kitchens and supplies
fresh air to bedrooms and living areas
[ε.ϯϮ.ϯ.ϯ."
"Some small dwelling units in mild climates are permitted to supply fresh air through passive
vents [9.32.3.4.(6)], but for most
dwelling units exhaust and supply will require a mechanical fan"


What can you build under the owner-builder HPO process? - Correct Answer- Single
detached home under a single title. One single dwelling unit in or attached to a pre-existing
building older than 10 years (includes

, the addition of a unit to convert a detached home to a duplex, or conversion of a duplex to
triplex, or conversion of non -residential space
to a dwelling unit). One single dwelling unit in or attached to a new non-residential building
(one only per building, such as a caretaker suite
or home built above a family-run store).
12. Who issues permits for a gas fireplace?


Which of the following is not allowed under the HPO owner-builder program? - Correct
Answer- A new dwelling unit attached to building *newer*
than 10 years old


Who issues permits for a gas fireplace? - Correct Answer- The Safety Authority - Now called
Technical Safety BC


Can an owner builder take out his or her own electrical permit? - Correct Answer- Yes -work
up to 200A is allowed.


What types of Buildings that Can be Wired by Homeowners? - Correct Answer- You are
entitled to do electrical work in a fully detached residential dwelling that you occupy or
intend to occupy. Your
dwelling may not contain a suite. Fully detached dwellings are buildings that are designed for
single family use only.
You are not allowed to do electrical work in or on any buildings if:
ͻ you do not live in or intend to live in the dwelling,
ͻ any part of the building includes a separate self-contained suite or occupancy,
ͻ the building, or any part of the building is being used to provide rental income, or
ͻ the building, or any part of the building is used for commercial purposes.


What is the best practice to apply asphalt waterproofing on a foundation? - Correct Answer-
Spray-on or roll on dry foundation with 2inch (max) below grade


What is best practice for waterproofing on foundation? - Correct Answer- Spray or roll 12
inch above grade on dry surface

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1094
Member since
1 year
Number of followers
102
Documents
68972
Last sold
11 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

175 reviews

5
75
4
31
3
46
2
8
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions