100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

OSSF Module 6 Questions and Answers 100% Correct | Updated 2024

Rating
-
Sold
-
Pages
41
Grade
A+
Uploaded on
14-08-2024
Written in
2024/2025

OSSF Module 6 Questions and Answers 100% Correct | Updated 2024

Institution
OSSF
Course
OSSF











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
OSSF
Course
OSSF

Document information

Uploaded on
August 14, 2024
Number of pages
41
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

OSSF Module 6 Questions and Answers
100% Correct | Updated 2024
Disposal and treatment selection criteria - ANSWER Primary - OSSF must
function properly under specific soil and other conditions present of the site.


Secondary - Cost, Minimal maintenance, simplicity of operation, long-term
reliability


Table XIII:
http://txrules.elaws.us/Gateway/Html//TITLE30/PART1/CHAPTER285/SUBCHAPTE
RI/285.91/2018-11-29/HTML/30_0285_0091-21.html


Installer I is able to construct and repair these systems - ANSWER Standard
Absorptive drainfield
ET (unlined) evaporation drainfield
Pumped effluent drainfields
Gravelless pipe drainfield
Soil Substitution


*can install holding tank but is extremely rare




See Table IX
http://txrules.elaws.us/Gateway/Html//TITLE30/PART1/CHAPTER285/SUBCHAPTE
RI/285.91/2018-11-29/HTML/30_0285_0091-22.html

,Piping in a house sewer - ANSWER Pipe is to be constructed of cast iron,
ductile iron, polyvinyl chloride (PVC) Schedule 40, standard dimension ratio (SDR)
or other approved material.


Pipes installed beneath driveways, sidewalks, or up to surface improvements must
use sch. 80 PVC or sleeved sch. 40 PVC


Pipe from house to treatment unit must be as large as the building drain, but no
smaller than 3 inch diameter




Line must be watertight and a two-way cleanout plug must be provided between
the building and the septic system


Slope of house sewer - ANSWER No less than 1/8 inch fall per foot of pipe. The
stub out location shall be at the highest possible elevation


Cleanouts - ANSWER a two-way cleanout plug must be provided between the
building and the septic system.


Additional cleanout shall be provided upstream and within 5 feet of every 90
degree bend and at least one cleanout every 100 feet


Septic tank - ANSWER Widely used on-site treatment option in Texas.

,Buried watertight tanks designed and constructed to receive wastewater from a
home or a business. They separate solids from liquids, provide limited anaerobic
digestion of organic matter, store solids, and allow the clarified liquid to discharge
for further treatment and disposal.


Settable solids and sludge settle at the bottom of the tank and accumulate. Scum
and other light material rise to the top


Performance of Septic Tanks - ANSWER Primary treatment, only partially treats
effluent and potential for disease transmission is virtually unchanged from raw
wastewater


They should remove 60-70% of suspended solids and oil and grease present in raw
wastewater


At best only 30-40% of BOD is removed


Calculating size of tank - ANSWER must be a 2 or 3 compartment design with 2
or 3 tanks in a series or a single structure with multiple compartments.
-First compartment must contain 1/2 to 2/3 of the required volume for a 2
compartment tank
-first compartment must contain 1/3 of required volume , but no less than 500
gallons


Tanks are sized to provide approximately 2-3 days detention time. The septic tank
volume is the liquid volume only.

, Usefulness of the septic tank system decreases as the size of the establishment
increases


See Table II in 30 TAC 285.91
http://txrules.elaws.us/Gateway/codepdf//TITLE30/PART1/CHAPTER285/SUBCHA
PTERI/285.91/2018-11-29/PDF/201206290-2.pdf


Location of Septic Tank - ANSWER With respect to the home or building is
usually determined by the slope of the land and the bathroom and kitchen
plumbing stub out from the home.


In new construction establish the best location depending on the soil for the
septic tank and disposal field, then locate the house and the plumbing within


Table X shows minimum distances


Locate and attempt to avoid public water lines, if it cannot be avoided, follow
rules to minimize potential of contamination


Avoid high traffic areas as excessive loads could damage the areas. Locate tank
near a route where it is easily accessible for maintenance.


Also consider future home expansion and additions


Materials of a tank - ANSWER Sturdy, watertight construction,; appropriate
materials include:
-steel-reinforced, poured in place concrete

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudySet Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2559
Member since
5 year
Number of followers
1735
Documents
16928
Last sold
1 day ago
STUDYSET WILL HELP YOU EARN A TOP SCORE ON YOUR EXAMS

avoid resits and achieve higher grades with Aplus satisfying exams,study guide,class notes and textbook notes

3.9

608 reviews

5
312
4
107
3
99
2
26
1
64

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions