100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

VA DEQ ESC Inspector Exam questions and answers.

Rating
-
Sold
-
Pages
34
Grade
A+
Uploaded on
13-08-2024
Written in
2024/2025

VA DEQ ESC Inspector Exam questions and answers.

Institution
SWM DEQ
Course
SWM DEQ











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWM DEQ
Course
SWM DEQ

Document information

Uploaded on
August 13, 2024
Number of pages
34
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

VA DEQ ESC
Inspector Exam
questions and
answers
VESCP
Virginia Erosion and Sediment Control Program

- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED
Minimum Standard 1
Stabilization

permanent or temporary soil stabilization shall be applied to
denuded areas within seven days after final grade is reached on
any portion of the site; temporary soil stabilization shall be
applied within seven days to denuded areas that may not be at
final grade but will remain dormant for longer than 14 days;
permanent stabilization shall be applied to areas that are to be
left dormant for more than one year
Previous
Play
Next

,Rewind 10 seconds
Move forward 10 seconds
Unmute
0:00
/
0:15
Full screen
Brainpower
Read More
Site NOT at Final Grade
- stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year
Site at Final Grade
- stabilize in 7 days (recommended immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw
Minimum Standard 2
Stock Piles, Waste and Borrow Areas

during construction, soil stock piles and borrow areas shall be
stabilized or protected with sediment trapping measures

mulch prevents erosion by protecting the surface from raindrop
impact and silt fence intercepts and detains from disturbed areas
Minimum Standard 3
Permanent Vegetation

,permanent vegetation cover shall be established on denuded
areas not otherwise permanently stabilized (permanent
vegetation shall not be considered established until a ground
cover is achieved that is uniform, mature enough to survive, and
will inhibit erosion there is no % associated with this)

reduce erosion and decrease sediment yield from disturbed area

this is the standard used to verify that a site is ready for release
of bonds or surety
Minimum Standard 4
First-Step Measures

Sediment basins and traps, perimeter dikes, sediment barriers
and other measures intended to trap sediment shall be
constructed as a first step in any land-disturbing activity and shall
be made functional before upslope land disturbance takes place

a certain amount of initial land disturbance may be required to
provide access for equipment to install the perimeter controls, but
site clearing and grading should be kept to a minimum until the
perimeter controls are in place

intercepts and detains small amounts of sediment from disturbed
areas during construction operation to prevent sediment from
leaving the site and decrease velocity of sheet flows and low-to-
moderate level channel flow
Perimeter Controls
assures that sediment does not leave the perimeter of the land-
disturbing area once site clearing, grading, and construction
commences

Examples: silt fences, sediment traps, sediment basins,
construction entrance, temporary diversions, diversions

, Minimum Standard 5
Earthen Structure Stabilization

stabilization measures shall be applied to earthen structures such
as dams, dikes, and diversions immediately after installation

reduce erosion and sedimentation and reduce damage from
sediment and runoff to downstream or off-site areas
Minimum Standard 6
Traps and Basins

sediment traps and basins shall be designed and constructed
based upon the total drainage area (not just disturbed area) to be
served by the trap or basin
Sediment Traps
minimum storage capacity shall be 134 cubic yards per acre of
drainage area and shall only control drainage areas less than 3
acres

stone outlet = trap
Sediment Basins
surface runoff from disturbed areas that is comprised of flow from
drainage areas greater than or equal to 3 acres shall be controlled
by a basin; minimum storage capacity of a sediment basin shall
be 134 cubic yards per acre of drainage area; the outfall system
shall, at a minimum, maintain the structural integrity of the basin
during a 25-year storm of 24-hour duration; runoff coefficients
used in runoff calculations shall correspond to a bare earth
condition or those conditions expected to exist while the sediment
basin is utilized.
Sediment Trapping Devises

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRAINBOOSTERS Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
661
Member since
2 year
Number of followers
250
Documents
22781
Last sold
11 hours ago

In this page you will find all documents , flashcards and package deals offered by seller BRAINBOOSTERS

4.5

341 reviews

5
265
4
30
3
21
2
5
1
20

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions