100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

SE 310 GR -2 (1).

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
12-08-2024
Written in
2024/2025

Exam of 9 pages for the course NBE SCIENCE at NBE SCIENCE (SE 310 GR -2 (1).)

Institution
Course

Content preview

SE 310 GR #2
"Did you build the right system?" - ANS-Validation

"Did you build it right?" - ANS-Verify

1) Identification of all tests to be performed and items that will be tested with schedule
2) Organizational responsibilities
3) Description of the test location
4) Description of test prep prior to each test phase (type)
5) Description of actual test phase
6) Plan for retesting
7) Description of the final report - ANS-Test and Evaluation Master Plan (TEMP)

Evaluation using analytical models (CAD, CAE,CAM, CAS) -- In conceptual design phase -
ANS-Analytical Evaluation

ENGINEERING T&E
• Evaluation of engineering models, service test models, system components, breadboards,
mock-ups, and rapid prototypes
• Verify basic performance and physical design characteristics
• Design changes are still low cost
○ ECP - Engineering Change Proposal
• In Prelim Design and Destial Design & Development - ANS-Type 1 Testing

DEVELOPMENTAL T&E
• Evaluation of prototype and early production models
• Qualification of the system (temp cycling, chock and vibration testing i.e. "Shake and Bake")
• Qualification: the process of demonstrating whether or not a system (or component) is
capable of satisfying
• Ex. McKinney Climatic Laboratory (Eglin AFB, FL)
• In Detail Design & Development - ANS-Type 2 Testing

SYSTEM INTEGRATION & TEST
• Production models evaluated at designated test sites
• Testing of production representative items in an operationally representative environment
• First tests of the fully integrated system
• Objective -- verify the TPMs and customer needs are satisfied

During Production and/or Construction Phase - ANS-Type 3 Testing

OPERATIONAL T&E

, • Testing performed when system is in the operational utilization and support phase
• Objective -- assess and improve system in operational use (change maintenance policies,
support for modifications, study for repair rates, aircraft block upgrades etc.) - ANS-Type 4
Testing

Tests accomplished to verify individual system performance characteristics. - ANS-Performance
Tests

Temperature cycling, shock and vibration, humidity, wind, salt spray, dust and sand, fungus,
acoustic noise, pollution emission - ANS-Environmental qualification

Tests are conducted to determine material characteristics relative to stress, strain, fatigue,
bending, torsion - ANS-Structural tests

Tests are accomplished on one more system elements to determine MTBF, MTBM -
ANS-Reliability qualifiaction

Tests are conducted on one more system elements to assess the values for mean active
maintenance time - ANS-Maintainability demonstration

Tests are often accomplished to verify compatibility among the prime equipment, test and
support equipment, test and support equipment, and transportation and handling equipment -
ANS-Support equipment compatibility tests

Tests are often accomplished to verify the relationships between people and equipment, people
and software, the personnel quantities and kill levels required, and training needs -
ANS-Personnel test and evaluation

Verification of operational and maintenance procedures is often accomplished - ANS-Technical
data verification

Verification of operational and maintenance software is accomplished. This includes software
units (CSUs), computer software configuration items (CSCIs) - ANS-Software verification

varification of various elements of the proposed supply chain with the applicable elements of
system is accomplished. Packaging and handling methods, warehouse and storage methods, -
ANS-Supply chain element compatibility tests

identify as early as possible where incompatibility may exist and where additional design activity
may be required - ANS-Compatibility tests with other elements within the higher-level SOS
structure

The probability that a system or product will perform in a satisfactory manner for a given period
when used under specific operating conditions - ANS-RELIABILITY

Written for

Course

Document information

Uploaded on
August 12, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
topgradesdr Jackson State University
Follow You need to be logged in order to follow users or courses
Sold
1549
Member since
2 year
Number of followers
9
Documents
16661
Last sold
1 week ago
TOPGRADES DOCTOR

Hi there! I'm an experienced academic professional specializing in exam preparation, test banks, and assignments. Whether you're gearing up for a big test, looking for top-notch study guides, or need expertly crafted assignments, I've got you covered. My materials are: Accurate and Comprehensive: Designed to help you excel in your studies. Tailored to Your Needs: Covering various subjects with real exam-style questions and solutions. Time-Saving: Concise, easy-to-understand resources to help you study smarter. Let me help you achieve your academic goals with confidence!

Read more Read less
4.8

302 reviews

5
262
4
24
3
8
2
2
1
6

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions