  What is meant by the term "two blocking" - Answer: The load block contacts the boom point sheaves Lifting 20,000 pound with a 2-leg bridle sling at 30% horizontal sling angle, what is the force applied to each leg. - Answer: 20,000 pound In multiple crane lifts using an equalizer beam, the weight of the beam should be considered. - Answer: Part of the load weight What is required if there is a deviation from the lift plan. - Answer: A new lift plan On level ground using skids and roilers, what percent of the load should yield the required line pull as a general rule of thumb. - Answer: 5% All of the following are results of unbalanced reeving of the hook block EXCEPT. - Answer: Wear on the hook Before a spreader bar or beams can be used they Must have been. - Answer: tested and approved When materials are being hoisted to an upper level, a tag line is used to. - Answer: Help control the load Two cranes are lifting 100 tons . If crane A has 40% of the load, how much weight will crane B have on its hook? - Answer: 60,000 lbs To confirm the rated capacity of a specific sling, consult the manufacturer's. - Answer: Sling tag OSHA regulations require hook replacement if the opening exceeds what percentage of its original throat opening? - Answer: 15% At what percentage of increase in length should a chin sling be removed from service? - Answer: 5% The methodical process that attempts to identify hazards and devise plans to overcome or eliminze hazards which may interfere with crane rigging is called. - Answer: Lift plan What provides additional control of a load being lifted - Answer: Tag lines When traveling on a rubber tire mobile crane . How should the boom be positioned? - Answer: in line with the directions of travel Before performing pick and carry operations with any mobile crane, it is important to: - Answer: Refer to the manufacturer's capacity chart According to ASME B30.5 a two crane lift is signaled by: - Answer: One designated person What is the PRIMARY concern when working with high boom angles? - Answer: Cross wind stability On multipie crane lifts, the load on each crane should NOT exceed what percentage of capacity? - Answer: 75% What are lifting lugs? - Answer: Eyeiets welded to a steel plate for lifting The formula for determining stress on a snatch block performing a vertical lift is: line pull x block factor = block load. What must be done to calculate formula? - Answer: Multiply the load weight by the coefficient of friction to determine line pull,and then use the standard formula If both fists are placed in front of your body with your thumbs pointed outward,the crane operator should: - Answer: Extend the boom section what is the MAXIMUM Percent of the rated capacity of a crane that can be used to lift personnel - Answer: 50% When does Eghtening present the gratest hazard to the crane and rigging personne ? - Answer: When thunder and lightning are apparent . What force would be required to move an object up an inclined plan compared to lifting it vertically? - Answer: 1 1/1 times more Personnel platforms shall NOT be used to lift - Answer: Tools and materials without employees All of the following are reasons for stopping personnel lifting operations EXCEPT - Answer: There are no tag lines When working in close quarters. the main concern is - Answer: safety The point of any object's weight can be assumed to be concentrated at - Answer: Center of gravity In a spur-gear chain hoist with a two chain system, the endless chain is used to. - Answer: Raise and lower the load All of the following conditions exert dynamic loading on a crane EXCEPT - Answer: Static boom angle Proper lead sheave placement as it relates to the hoisting drum location is - Answer: proper spooling of wire rope The most important information to consider when planning a lift is - Answer: Weight of the load Prior to use all new aitered modified or repaired rigging hardware shall be inspected by whome ? - Answer: A designated person An unsafe condition that riggers should be aware of when dealing with a multi part load block is: - Answer: Twisting multi part lines most cranes in duty cycle operation require a: - Answer: load test the only personnel allowed to have their body parts outside of the suspended personnel platform during hoisting and iowering operations are: - Answer: signal persons what is the most important reason rigging hardware should NOT be modified? - Answer: It could negatively affect its capacity In the term (D/d ratio) the d is an abbreviation for: - Answer: Diameter A document that outlines weights, crane configuration and rigging requirements for a lift is called a: - Answer: Lift plan When using a 2-inch wire rope sling in a verticle basket hitch lifting a24- foot long, 36- inch diameter pipe, - Answer: 36 to 1 What is an LMI? - Answer: Load moment Indicator Location of electrical hazards on the job site should be documented on a: - Answer: Lift plan When formating a lift plan, a PRIMARY concern for the person doing the rigging is: - Answer: capacity of rigging When using a wedge socket, the dead end of the rope is secured by the: - Answer: Wedge when erecting or stowing a swing-away lattice extension, what should be used to control the movement of the extension? - Answer: Tagline Planning for rigging is required: - Answer: Only when lifting any load A lift plan must be compieted by a: - Answer: Supervisor Anchorage points for fali arrest for a single person MUST be able to hold: - Answer: 5000 lbs Which of the following items are used for heavy rigging? - Answer: slings, shackles, and spreader beam If the jacket of a synthetic round sling is damaged, that sling should be: - Answer: Removed from service immediately Which of the following is NOT a factor when making sub merged lifts? - Answer: Water temperature When a tugger is mounted where the operator can NOT see the load, the signal person MUST use: - Answer: signals used for cranes Who can design a personnel platform? - Answer: A qualified personnel A one-inch, 3-leg bridle wire rope sling, rigged at a 45° angle, is good for 18 tons. The addition of a fourth leg will increase your capacity by: - Answer: 0 lbs After any structural repair or modification, a personnel lifting platform shall be tested to what percentage of the platform rating? - Answer: 150% All of the following statements about crane contact with power lines are TRUE EXCEPT: - Answer: The operator should leave the cab as quickly as possible Loads int introduced in+o the machine or its components due to accelerating or decelerating force is called - Answer: Dynamic loading Using the sling Chart provided, what is the rated capacity if 1/2 inch sling in a basket hitch with sling lugs 90 degrees? - Answer: 6,200 lbs When lifting 100,000 pounds, the main load block must be reaved with how many parts of line? - Answer: 4 What standard hand signal is being communicated in the illustration - Answer: Travel(one track) What standard hand signal is being communicated In the illustration? - Answer: use whip line using the chart. how many parts of line are needed to lift a load weighing 265,000 pounds? - Answer: 9 In an emergency situation, what is the rigger's FIRST priority? - Answer: To prevent injury or loss of life

Show more Read less
Institution
Ncccer Advance Rigger
Course
Ncccer advance rigger









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Ncccer advance rigger
Course
Ncccer advance rigger

Document information

Uploaded on
August 11, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Advanced Rigger
Exam Questions
and Complete
Answers Graded
A+
Denning [Date] [Course title]

, What is meant by the term "two blocking" - Answer: The load block contacts the boom point sheaves



Lifting 20,000 pound with a 2-leg bridle sling at 30% horizontal sling angle, what is the force applied to
each leg. - Answer: 20,000 pound



In multiple crane lifts using an equalizer beam, the weight of the beam should be considered. - Answer:
Part of the load weight



What is required if there is a deviation from the lift plan. - Answer: A new lift plan



On level ground using skids and roilers, what percent of the load should yield the required line pull as a
general rule of thumb. - Answer: 5%



All of the following are results of unbalanced reeving of the hook block EXCEPT. - Answer: Wear on the
hook



Before a spreader bar or beams can be used they Must have been. - Answer: tested and approved



When materials are being hoisted to an upper level, a tag line is used to. - Answer: Help control the load



Two cranes are lifting 100 tons . If crane A has 40% of the load, how much weight will crane B have on its
hook? - Answer: 60,000 lbs



To confirm the rated capacity of a specific sling, consult the manufacturer's. - Answer: Sling tag



OSHA regulations require hook replacement if the opening exceeds what percentage of its original
throat opening? - Answer: 15%



At what percentage of increase in length should a chin sling be removed from service? - Answer: 5%

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug Grand Canyon University
View profile
Follow You need to be logged in order to follow users or courses
Sold
171
Member since
1 year
Number of followers
26
Documents
14332
Last sold
4 days ago
Your Exm Plug

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Read more Read less
4.3

67 reviews

5
38
4
16
3
7
2
4
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions