NC Building Contractor License-Questions with Correct Answers/ Verified/ 100% Pass

Rating
-
Sold
-
Pages
34
Grade
A+
Uploaded on
07-08-2024
Written in
2024/2025

Prime Contractor -️️The ______asummes the entire responsibility under the contract Sub Contractor -️️The ______ asummes responsibility with respect to his portion of the work 6ft -️️Safety Belts shall be a min of 1/2 inch nylon and not allow a fall greater than ____ 8ft -️️Safety Nets must extend _____ beyond the end of work surface 25ft -️️Safety Nets must be positioned no more than _____ below work surface 10ft -️️Heaters must not be located within ______ft of tarps, canvas or similar coverings 10ft -️️Material Storage : Materials shall not be stored within ____ ft of an exterior wall

Show more Read less
Institution
NC Building Contractor License
Course
NC Building Contractor License











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NC Building Contractor License
Course
NC Building Contractor License

Document information

Uploaded on
August 7, 2024
Number of pages
34
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NC Building Contractor License-Questions with Correct
Answers/ Verified/ 100% Pass
Prime Contractor - ✔️✔️The ______asummes the entire responsibility under the contract



Sub Contractor - ✔️✔️The ______ asummes responsibility with respect to his portion of the work



6ft - ✔️✔️Safety Belts shall be a min of 1/2 inch nylon and not allow a fall greater than ____



8ft - ✔️✔️Safety Nets must extend _____ beyond the end of work surface



25ft - ✔️✔️Safety Nets must be positioned no more than _____ below work surface



10ft - ✔️✔️Heaters must not be located within ______ft of tarps, canvas or similar coverings



10ft - ✔️✔️Material Storage : Materials shall not be stored within ____ ft of an exterior wall



7ft - ✔️✔️Materaial Storage : Brick stacks shall not be more than _____ft in height



6ft - ✔️✔️Material Storage : When masonry blocks are stacked higher than _____ ft the stack shall
be tapered back 1 half block per tier above the ____ft line



20ft - ✔️✔️Material Storage : Lumber Piles shall not exceed ______ft in height (mechanically)



16ft - ✔️✔️Material Storage - Lumber piles shall not exceed _____ in height (manually)



20ft - ✔️✔️A chute is required if waste material is dropped more than _____ft outside exterior
walls of building



8 Inches - ✔️✔️How far do you Lap Durawire



Confined - ✔️✔️workers in _____ spaces must be provided a lifeline/safety belt

,Catenary Scaffold - ✔️✔️means a suspension scaffold consisting of a platform supported by two
essentially horiztonal & parallel ropes attached to structural members of a building or other
structure



Prescription Lenses - ✔️✔️employer ensures that employees who wear presc lenses while engaged
in operations needing eye protection



12ft - ✔️✔️Maximum height of a masonry pier used in a seismic zone is _____



Float (Ship) Scaffold - ✔️✔️means a suspension scaffold consisting of a braced platform resin on
two parallel bearers & hung from overhead supports by ropes of fixed length



Lack Of Maintenance - ✔️✔️The leading reason for erosion and sediment conrol plan failure is
_____



Potable Water & Detergents - ✔️✔️To clean masory use _______



Wood Girders : Wood - ✔️✔️No Masonry shall be supported on ______ or other forms of _____
construction



Roof Diaphragms : 15 Inches - ✔️✔️_______ Shall be anchored to masonry walls with 1/2"
diameter bolts 6ft on center or equivalent. Bolt shall extend & be embedded at least _____ in the
masonry



8 Inches - ✔️✔️Minimum thickness of a parapet wall



24 Inches - ✔️✔️Maximum spacing of light gauge studs



TRUE - ✔️✔️Mechanicla connections shall have the bars connection to develop in tension or
compression as least 125% of the yield strength of the bar



No - ✔️✔️Is a hardhat required with a jack hammer?

,42" Reflectorized Barrell or Drum - ✔️✔️What is preferred safety traffic marker?



A penetrometer - ✔️✔️What is used to measure soil bearing capactiy?



Lap durawire 8 inches - ✔️✔️Lap durawire 8 inches



3 times - ✔️✔️Unreinforced masonry parapet wall heights shall not exceed _____ their thickness



6 Inches - ✔️✔️Minimum thickness of a masonry bearing wall - One Story



8 inches - ✔️✔️Minimum thickness of a masonry bearing wall - More than One Story



4.5 Sq Ft - ✔️✔️There shall be at least one metal tile for each ______ of wall area



24 Inches - ✔️✔️Vertical Spacing on Metal Wall Tie



36 Inches - ✔️✔️Horiztonal Spacing on Metal Wall Tie



3500 PSI - ✔️✔️The minimum compressive strength for a carport slab in severe exposure zone is
_____



Shut Off - ✔️✔️hand held power tools (circular saw, chain saw & percussion tools) require a
constant pressure switch that will _____the power when pressure is released



30 PSI - ✔️✔️Compressed air shall not be used for cleaning purposes except where reduced to less
than _____ PSI



Trained - ✔️✔️Only employees who have been ____ in the operation of the particular tool in use
shall be allow to operate powder actuated tools

, Circular Saws - ✔️✔️All Portable, power driven _____ shall be equipped with guards above and
below the base plate or shoe



Upright - ✔️✔️Compressed gas cylinders shall be secured in an ______ position at all times



20 Ft - ✔️✔️Oxygen Cylinders and fuel cylinders must be stored a minimum of ____ and when in
inside _____ from combustible materials



Inspected - ✔️✔️All gas and oxygen hoses must be _____ at the beginning of each work shift



8 and 11 - ✔️✔️Unless otherwise required, mix grout to a consistency that has a slumb between
______



Gravel - ✔️✔️Sediment Basins must be built over _____



1 Acre or Larger - ✔️✔️An erosion and sedimentation control plan must be approved before land
distrubance begins on any site ______



Slopes - ✔️✔️Runoff must be diverted across the ______



Acid : Caustic Solutions - ✔️✔️Unless otherwise required, do not use ______ or _______



Near The Source - ✔️✔️Where is sediment most effectively controlled?



Permanent Ground Cover - ✔️✔️A ______ sufficient to control erosion must be installed within 30
working days or 120 calendar days whichever is less after the construction is complete



The person that is financially responsible for the land disturbing activity - ✔️✔️Who is responsible
for Sediment Control?



Sediment Penalties - ✔️✔️Max Fine $5k per day : Failure to submit plan $1k : Violation of Plan
$500/Day : Stop Work Order

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamsCollection Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
123
Member since
2 year
Number of followers
9
Documents
22104
Last sold
1 day ago
EXAMS PAGE

I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey with ExamsCollection!✅✅✅

3.8

35 reviews

5
18
4
3
3
8
2
0
1
6

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions