100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

LOG 100 - Life Cycle Logistics Fundamentals (Module 3) Latest(2024/2025) Questions and Answers 100% Correct.

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
04-08-2024
Written in
2024/2025

Mission Frequency and Duration - The bomber and the accompanying avionics suite will likely be in the air three to four times each week Affordability - All available funds have been depleted after one year of deployment because the logistics costs were minimized Anti-Tamper - The highly sensitive information in the software for the avionics suite was accessed by an unauthorized person Anticipated Service Life - The avionics suite should be functional for at least 4,500 service hours Choose the correct definition of the logistics measure of weight: - Total tonnage of deployable consumables, support equipment, energy (fuel, oil, etc.), and spares Choose the correct purpose of Design Interface: - Ensures that logistics support considerations are part of the design process and that the system design is fully supported by the Integrated Product Support elements Cost - The added repair components are in excess of the budget line item allocated for system sustainment Deployment - The avionics suite will be deployed to a theater that has high temperature variations in a single day Design for Support - -Establish supportability objectives -Perform Functional Analysis -Identify capabilityDesign the Support - -Determine levels of repair -Perform Maintenance Task Analysis -Identify likely modes of failure Disposal - At the end of the life cycle, the software fell into the hands of an adversary Engineering and Manufacturing Development - -Draft Product Support Plan -Produce prototypes -Assess ability to meet Key Performance Parameters Enhance Interoperability - These fasteners have been easier for the repair personnel to replace because fewer changes of tools are required. Human Capability and Limitations - Personnel using the bomber will not likely be in a hazardous or radioactive environment Human Factors Engineering - The repair personnel have not been trained on how to repair the avionics system Affordability - All available funds have been depleted after one year of deployment because the logistics costs were minimized Maintainability - -Replacing plastic will require higher grade repair personnel -Design includes coupling that is easy to access during repairs -Personnel have experience replacing new exterior panel Maintainability - The avionics suite is placed in such a way that it is difficult to access Materiel Solution Analysis - -Specify measurable support performance requirements -Provide procedures to develop supportability assessments-Design parameters to address operational effectiveness Mobility - The bomber will likely be deployed in a theater that is a long distance from supply outposts and allies Other Support Factors - -High grade plastic requires less packing material for transit -Use of proposed exterior panel requires new tooling machinery -Proposed coupling uses parts already in inventory Parts standardization reduces costs and improves asset availability due to: 1. Enhanced interchangeability, reliability, and availability of parts 2. Reduced proliferation of parts and drawings 3. Diminished single source impacts and parts obsolescence 4. Promotion of commonly used industry parts - All of the choices are correct Personnel - The average maintenance person does not have the qualifications to repair the new avionics suite Promote Reliability and Safety - The fasteners have been validated, and have a known life span, resulting in a predictable replacement schedule before breakage. Provide Cost Savings - Five lots of 10,000 fasteners were purchased, instead of seventeen lots of 3,000. The price per item was renegotiated. Reduce Acquisition Lead-Time - The proposed fasteners have been designed and validated by logistics and do not require the design process. Reduce the Variety of Parts - The team has worked to redesign the system to use five sizes of composite fastener, instead of seventeen sizes.Reliability - -New exterior panels have longer time between replacement -Replacing glass with plastic will reduce performance life span -Design includes coupling that has a 50% greater life span Reliability - The system breaks every 25 hours of use, requiring repair Safety - Access to avionics suite can be dangerous due to the proximity to the fuel lines Select all responses that are true about logistics footprint: - -The logistics footprint is the size or "presence" of logistics support required to deploy, sustain, and move a weapon system -A large logistics footprint can adversely affect a rapid deployment and its sustainability -The logistics footprint includes personnel, supplies/equipment, land, and facilities necessary to deploy and sustain a weapon system Select the true statement about Parts Standardization. - Parts standardization seeks to use existing parts and equipment rather than designing, developing, and producing new parts. Support the Design - -Perform Sustaining Engineering tasks -Establish technical data needs -Identify support equipment requirements Weight - During the Analysis of Alternatives, the decision was made to use a denser material for exterior panel Supportability factors include: - The more reliable and maintainable the system is, the less support it will require once it is fielded. The primary objective is to reduce the need for logistics support after a weapon system is fielded. Technology Maturation and Risk Reduction - -Develop a baseline comparison system -Perform trade-off analyses-Develop alternative support concepts Using the Affordable System Operational Effectiveness chart (page 3 of 12) Select the design components that promote supportability: (Select all that apply.) - -Reliability -Maintainability Volume - Several new tooling components must be added, resulting in more repair space required The system design parameter of System Safety: - Addresses risks to personnel and equipment

Show more Read less
Institution
LOG 100 - Life Cycle Logistics Fundamentals (Modul
Course
LOG 100 - Life Cycle Logistics Fundamentals (Modul









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
LOG 100 - Life Cycle Logistics Fundamentals (Modul
Course
LOG 100 - Life Cycle Logistics Fundamentals (Modul

Document information

Uploaded on
August 4, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

LOG 100 - Life Cycle Logistics
Fundamentals (Module 3)
Mission Frequency and Duration - The bomber and the accompanying avionics suite will likely be
in the air three to four times each week



Affordability - All available funds have been depleted after one year of deployment because the
logistics costs were minimized



Anti-Tamper - The highly sensitive information in the software for the avionics suite was accessed
by an unauthorized person



Anticipated Service Life - The avionics suite should be functional for at least 4,500 service hours



Choose the correct definition of the logistics measure of weight: - Total tonnage of deployable
consumables, support equipment, energy (fuel, oil, etc.), and spares



Choose the correct purpose of Design Interface: - Ensures that logistics support considerations are
part of the design process and that the system design is fully supported by the Integrated Product
Support elements



Cost - The added repair components are in excess of the budget line item allocated for system
sustainment



Deployment - The avionics suite will be deployed to a theater that has high temperature
variations in a single day



Design for Support - -Establish supportability objectives

-Perform Functional Analysis

-Identify capability

, Design the Support - -Determine levels of repair

-Perform Maintenance Task Analysis

-Identify likely modes of failure



Disposal - At the end of the life cycle, the software fell into the hands of an adversary



Engineering and Manufacturing Development - -Draft Product Support Plan

-Produce prototypes

-Assess ability to meet Key Performance Parameters



Enhance Interoperability - These fasteners have been easier for the repair personnel to replace
because fewer changes of tools are required.



Human Capability and Limitations - Personnel using the bomber will not likely be in a hazardous or
radioactive environment



Human Factors Engineering - The repair personnel have not been trained on how to repair the
avionics system

Affordability - All available funds have been depleted after one year of deployment because the
logistics costs were minimized



Maintainability - -Replacing plastic will require higher grade repair personnel

-Design includes coupling that is easy to access during repairs

-Personnel have experience replacing new exterior panel



Maintainability - The avionics suite is placed in such a way that it is difficult to access



Materiel Solution Analysis - -Specify measurable support performance requirements

-Provide procedures to develop supportability assessments

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PatrickKaylian Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1823
Member since
2 year
Number of followers
1044
Documents
22148
Last sold
5 days ago

3.8

317 reviews

5
147
4
60
3
54
2
16
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions