Which of the following is NOT usually one of the bid documents? - ANS-Technical specifications
The competition criteria used to determine the chosen constructor are - ANS-Price
B.Qualifications
Any selection process in which proposals contain both price and qualitative components and the
award is based upon a combination of price and qualitative considerations is - ANS-Best value
Which type of bond guarantees that the payment for a contractor's labor and materials used on
the project will be made? - ANS-payment bond
D.labor and materials payment bond
Public projects have historically been decided by selection of: - ANS-The lowest responsive bid
in conformance with the bid requirements
The part of a design-build proposal that stipulates the price at which the design-builder will
provide the design and construction services necessary to complete the project is: - ANS-Price
proposal
The low-bid selection method involves bidders obtaining plans and specs for review by: -
ANS-The constructor and prospective sub-contractors
Open bidding is required on public projects because _____? - ANS-they are funded by
taxpayers' dollars
A bid or proposal package that meets all of the requirements of the solicitation instrument is a: -
ANS-Responsive bid
The selection methods used for selecting construction and construction management services -
ANS-A.Low-bid
B.Best-value (BVS)
C.Qualifications-based (QBS)
If missing at the bid opining, which one of the below items is cause to reject the bid? -
ANS-A.Sealed envelope
B.Contractor's license
C.Contractor's name