Question Bank in line with Project Management Process, Technology and Practice,Vaidyanathan

Rating
-
Sold
-
Pages
311
Grade
A+
Uploaded on
25-06-2024
Written in
2023/2024

You've just reached Stuvia's #1 exam prep shop. To make this straight to the point, you are using Project Management Process, Technology and Practice,Vaidyanathan textbook and want to ensure you are fully prepared for your professor's challenging tests to secure passing grade (at minimum), correct? Okay, we have the effective solution for you! All you need is the official practice test bank created specifically for your textbook. It introduces you to all kind of topics and quetions that might be asked. Not only that! these questions come with verified answers, so that you don't waste endless hours figuring out a solution for a particular question. Click buy button and access your life-changing practice exam questions within a few seconds.

Show more Read less











Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
June 25, 2024
Number of pages
311
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

Project Management: Process, Technology, and Practice (Vaidyanathan)

Chapter 1 Projects and Project Management



1.1 True False



1) An example of a project is an accounting clerk entering journal entries.

Answer: FALSE

Diff: 2 Page Ref: 2



2) A project has a beginning and an end.

Answer: TRUE

Diff: 1 Page Ref: 2



3) Based on research cited in the textbook, 31 percent of software projects were canceled
before completion and cost an average of 189 percent of their original estimates in more
than half the projects.

Answer: TRUE

Diff: 3 Page Ref: 3



4) Complexity refers to the extent to which the items or elements upon which work is
performed or the work processes themselves are interrelated.

Answer: FALSE

Diff: 2 Page Ref: 6



5) Interdependence refers to the number of products or operations that are performed at
the same time and the resulting degree of difficulty.

Answer: FALSE

,Diff: 2 Page Ref: 6



6) Complexity in a project is directly attributed to the scope of the project.

Answer: TRUE

Diff: 1 Page Ref: 7



7) When developed, the DVD player was considered a Type C Level 1 project.

Answer: TRUE

Diff: 1 Page Ref: 8



8) A project is a set of activities to solve a problem or take advantage of an opportunity.

Answer: TRUE

Diff: 1 Page Ref: 8



9) Conceptualization is a process used to set the goals of a project, develop strategies to
support an organization's strategic goals, and outline tasks and schedules to accomplish
the project goals.

Answer: FALSE

Diff: 2 Page Ref: 9

,10) The pre-feasibility study is usually used to assess whether to conduct a full feasibility
study.

Answer: TRUE

Diff: 1 Page Ref: 9

11) A discovery audit is a controlled process for identifying potential problems and
opportunities.

Answer: FALSE

Diff: 2 Page Ref: 9



12) During the post-implementation phase, a project is brought to its proper completion.

Answer: FALSE

Diff: 2 Page Ref: 10



13) Quality functional deployment, Kano model, and affinity diagrams are tools used
during the design phase.

Answer: TRUE

Diff: 2 Page Ref: 11



14) A clear statement of project needs is an output associated with the planning phase.

Answer: FALSE

Diff: 2 Page Ref: 11



15) Risk management plans are an output associated with the analysis phase.

Answer: FALSE

Diff: 2 Page Ref: 11

, 16) User manuals are an output associated with the implementation phase.

Answer: TRUE

Diff: 2 Page Ref: 11



17) Project management and engineering and services of projects are the two main
streams of project activities.

Answer: TRUE

Diff: 2 Page Ref: 12



18) Final launch documents are an output associated with the closure phase.

Answer: TRUE

Diff: 2 Page Ref: 12



19) A benefit of project management is that it creates a structure and process that enables
a project to be kept under control.

Answer: TRUE

Diff: 2 Page Ref: 14

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestBank4Textbooks Harvard Law School
View profile
Follow You need to be logged in order to follow users or courses
Sold
209
Member since
1 year
Number of followers
25
Documents
2967
Last sold
1 week ago
Practice tests and quizzes

You can find bunch of tests, quizzes, and practice exams for a lot of college-level textbooks and classes. We cover colleges in the U.S. , Canada and worldwide.

4.0

37 reviews

5
24
4
2
3
4
2
2
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions