COSC 275 Exam 2 (Palmer) Questions And Answers 100% Verified.
COSC 275 Exam 2 (Palmer) Questions And Answers 100% Verified. Hard bid low price - answerOwner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - answerInvolves criteria other than price when awarding contract Weight given to each criteria that will be considered Construction Manager at Risk CMAR - answerConstruction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. Design Build - answerOnly one contract - between owner and design-build contractor May be one entity or contractor and architect in a contract. most common steel type? a) A529 - 50 KSI b) A36 - 36 KSI - answera) A529 - 50 KSI Weathering steel a)A242 b)A585 c) both - answerc) Both W - answerwide flange S - answerI beam M - answermiscellaneous
Written for
- Institution
- Cosc
- Course
- Cosc
Document information
- Uploaded on
- June 24, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cosc 275 exam 2 palmer questions and answers 100
Also available in package deal