What is a C3 capability code - ANSWERSpartial capability
What is a C1 capability code - ANSWERSfull capability
The phase maintenance concept - ANSWERSdivides the total scheduled maintenance requirement into small packages or phases of approximately the same work content. These are done sequentially at specified intervals.
Scheduled maintenance requirements are the - ANSWERSminimum necessary under all conditions and are mandatory to ensure timely discovery and correction of defects.
True or False: Reporting custodians may increase the depth or frequency of any scheduled inspection or may require additional inspections whenever excessive flight or calendar time has elapsed between inspections, or environmental or operational conditions are considered to have impaired the material reliability or integrity of the equipment. - ANSWERSTrue
The SE Custody and Maintenance History Record________is used to record acceptance information, custody and transfer, rework, preservation and depreservation, TDs, and any other miscellaneous history
required to accompany the SE throughout its service life. - ANSWERSCNAF 4790/51
The purpose of the MMP is to - ANSWERSprovide scheduled control of the predictable maintenance workload, for example, inspections, transfer or receipt of aircraft, and compliance with TDs.
What is a ZF7 supply code - ANSWERSBroad arrow What is a priority 1 work code - ANSWERSsupport of NMC or PMC aircraft, also assigned to activies that are 30 days away from deployment
What is a priority 2 work code - ANSWERSRepair of critical LRCAs and SE. This priority is also assigned to O-level maintenance activity's work stoppage requirements.
What is a priority 3 work code - ANSWERSRepair of noncritical LRCAs and SE, and repair or manufacture of material for nonfixed allowance stock.
True or false: OMA level work center supervisors shall complete the Naval Aviation OMA Work Center Supervisor's course - ANSWERSTrue
What is the primary job of the work center supervisor - ANSWERSto be responsive to the hour by hour maintenance situation.
The work center supervisor should complete the BMT training with the AIRspeed Officer within how many days of assignment - ANSWERS30 days
For I level non-RFI component what copies of the MAF/WO copies does the work center recieve - ANSWERS1,4 and 5
For I level non-RFI components where does copy 5 of the MAF/WO go - ANSWERSon the VIDS board
After verifying the Work Center Copy 5 with the VIDS/MAF Copy 1 DAR, what is done with copy 5? - ANSWERSCopy 5 is destroyed
Aircraft without MRC cards will be calibrated using the following guidelines: - ANSWERSa. At least once each 12 months from last calibration.
b. Within 90 days prior to a scheduled extended deployment of 60 days or more.
The aircraft compass calibration requirements and procedures are found in what instruction - ANSWERSMIL-STD-765A, and applicable MIMs