Which statement best defines the concept of environmental sustainability? A method to relate emissions of volatile organic compounds to equipment performance levels Assuring the creation and use of a built environment that does not harm the natural environment A more intensive maintenance approach to lengthen the working life of a system or equipment A method for comparing the relative value of staff against contractors. - Answer-B Sustainability as an ecologically-based term refers to activities that reduce consumption, waste, habitat and the natural environment. The other choices have no relationship to the term.(Reference: 2-3-2) Chapter 2 Assess and Inspect Facility Needs What best describes the purpose of reliability-centered maintenance (RCM)? It is an alternative model to measuring lowest total cost of ownership (TCO) It is a policy of 100% planned maintenance. It is a way to measure equipment run-to-failure modes. It is a philosophy to balance the total expense of predictive and preventive maintenance against the total cost of breakdown. - Answer-D RCM determines the best mix of preventive/predictive maintenance and proactive/corrective repairs to produce the required availability and functional reliability at the lowest cost and includes TCO factors.(Reference: 3-3-3) Chapter 3 Manage, Oversee, and Monitor O&M of Building, Systems, and Equipment Which statement most correctly describes a competent facility manager's responsibilities relative to operations and maintenance? Develop the facility's ownership strategy Determine type of occupants Decide the facility's mission Develop the highest possible reliability at lowest overall total cost - Answer-D As a cost center, O&M supports the goals and mission of the organization by balancing acceptable costs against suitable occupant service by demonstrating lowest total overall cost; the other answers reflect strategic planning by ownership.(Reference: 1-1-2) Chapter 1 Introduction to Operations and Maintenance What best describes the role of incentives relative to operations and maintenance activities? They only work for the short term because they become expected and thus lose their value as incentives. They may be used with staff but are difficult to monitor with contracted services. They may be financial or non-financial to influence a particular behavior or result.

Show more Read less
Institution
Course

Content preview

IFMA OPERATIONS AND MAINTAINENCE
Which statement best defines the concept of environmental sustainability?
A method to relate emissions of volatile organic compounds to equipment performance
levels
Assuring the creation and use of a built environment that does not harm the natural
environment
A more intensive maintenance approach to lengthen the working life of a system or
equipment
A method for comparing the relative value of staff against contractors. - Answer-B
Sustainability as an ecologically-based term refers to activities that reduce consumption,
waste, habitat and the natural environment. The other choices have no relationship to
the term.(Reference: 2-3-2) Chapter 2 Assess and Inspect Facility Needs

What best describes the purpose of reliability-centered maintenance (RCM)?
It is an alternative model to measuring lowest total cost of ownership (TCO)
It is a policy of 100% planned maintenance.
It is a way to measure equipment run-to-failure modes.
It is a philosophy to balance the total expense of predictive and preventive maintenance
against the total cost of breakdown. - Answer-D RCM determines the best mix of
preventive/predictive maintenance and proactive/corrective repairs to produce the
required availability and functional reliability at the lowest cost and includes TCO
factors.(Reference: 3-3-3) Chapter 3 Manage, Oversee, and Monitor O&M of Building,
Systems, and Equipment

Which statement most correctly describes a competent facility manager's
responsibilities relative to operations and maintenance?
Develop the facility's ownership strategy
Determine type of occupants
Decide the facility's mission
Develop the highest possible reliability at lowest overall total cost - Answer-D As a cost
center, O&M supports the goals and mission of the organization by balancing
acceptable costs against suitable occupant service by demonstrating lowest total overall
cost; the other answers reflect strategic planning by ownership.(Reference: 1-1-2)
Chapter 1 Introduction to Operations and Maintenance

What best describes the role of incentives relative to operations and maintenance
activities?
They only work for the short term because they become expected and thus lose their
value as incentives.
They may be used with staff but are difficult to monitor with contracted services.
They may be financial or non-financial to influence a particular behavior or result.
They are specific to financial inducements such as bonuses, prizes and gifts. - Answer-
C Incentives represent a broad category of rewards and recognition. Descriptions that
limit or make assumptions beyond the purpose of influencing specific actions cannot be

, supported against the correct answer.(Reference: 5-4-5) Chapter 5 Select the Best
Resources

Which statement more accurately describe the total quality management (TQM)
approach?
TQM is an organizational business model but not useful for measuring operations and
maintenance performance.
TQM improves efficiency by anticipating and avoiding problems.
TQM is usually applied at the end of a service to measure occupant satisfaction.
TQM is a measurement used for contractors but not for staff - Answer-B TQM is a well-
known quality approach that competent facility managers use to continuously improve
services for the benefit of occupants and the entire organization. As such it becomes
part of nearly every aspect and stage of O&M activities.(Reference: 4-2-1) Chapter 4
Manage, Oversee, and Monitor Occupant Services

At what point does the work flow process generally begin?
It is the ongoing activity of checking work accomplished against performance standards.
It has no place in the maintenance work flow because it describes an emergency
procedure.
It is the activity of greeting maintenance personnel and assigning tasks.
It is where work requests are received and collected from the preventive maintenance
schedule or help desk (work management center). - Answer-D Competent facility
managers may use different terms and have different methodologies for managing
maintenance, however all have some method for gathering inputs (work requests) from
which to assign work. No other choice offers a credible explanation.(Reference: 3-3-4)

What materials are typically used for a bituminous roof?
Paving slabs.
Felts and small minerals.
Thermoset rubber polymers
Polyvinyl chloride (PVC) and adhesives - Answer-B. Bituminous roofs apply felts,
minerals and fillers in built-up layers. Single-ply roof systems use thermoset membranes
that are welded together with heat or chemicals. Loose-laid ballasted roofs use a layer
of stones, gravel, paving slabs or even soil.(Reference: 2-2-1)

What is NOT true of a service level agreement (SLA)?
It should generally reflect what occupants expect in the performance of services.
It describes in measurable terms what services a contractor will furnish.
It is a negotiated set of expectations that both parties agree upon.
It is used exclusively as an incentive and rewards approach for staff. - Answer-D.
Service level agreements are generally developed between the facility representative
and the contractor and never exclusive to staff, especially not as a recognition tool.
(Reference: 5-1-2)

What is an approach to preventive maintenance as an equipment maintenance
strategy?

Written for

Course

Document information

Uploaded on
June 12, 2024
Number of pages
13
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.19
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights Birkbeck, University of London
Follow You need to be logged in order to follow users or courses
Sold
1143
Member since
4 year
Number of followers
882
Documents
19599
Last sold
3 days ago

4.0

221 reviews

5
121
4
43
3
24
2
11
1
22

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions