CON 101- CSU EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/
CON 101- CSU EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/ civil drawings - -all work associated with the site structural drawings - -all work associated with the structural framing mechanical drawings - -plumbing & HVAC electrical drawings - -Includes all rough wiring, transformers, and panel boxes, as well as receptacles, switches and lighting fixtures 4 sections of specs - -bidding documents, general conditions, supplemental conditions, technical specifications the project manual= - -specs drawings= - -plans Bidding Documents - -The invitation to bid, instructions to bidders, bid form, and the contract documents. Bid forms should indicate - -bid price, completion date, subcontractors, alternate pricing, and receipt of addendum general conditions - -Responsibilities of each of the parties are clearly delineated and specific terms of the contract are defined in this section supplemental conditions - -these conditions are adapted to suit the particular requirements of the project and they alter the general conditions technical specs - -bulk of the project manual, deals directly with construction CSI - -Construction Specifications Institute- 1948 1995 CSI masterformat has how many divisions? - -16 2004 CSI masterformat has how many divisions? - -49 Division 01 - -General Requirements Division 02 - -Existing Conditions Division 03 - -concrete Division 04 - -Masonry who determines what contract the pr
Written for
- Institution
- CON 101
- Course
- CON 101
Document information
- Uploaded on
- June 7, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
con 101 csu exam 2 review questions and answers
Also available in package deal