100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PJM Exam Questions and Answers 100% Correct

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
05-06-2024
Written in
2023/2024

PJM Exam Questions and Answers 100% Correct During reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO - Correct Answer ️️ -TO Generation available within 10 minutes for offline reserve units: Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? - Correct Answer ️️ -20 MVA Minimum MVARs for an aggregate of generators that is required to do reactive testing? - Correct Answer ️️ -75 MVA Power transformer is connected to the generator with which line? - Correct Answer ️️ - Primary In a balancing authority region, If a site trips offline, what increases? - Correct Answer ️️ -positive time error How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? - Correct Answer ️️ -6 hrs How does PJM avoid dealing with economic issues during transmission related constraints - Correct Answer ️️ -cost (offer) capping generation If a generator doesn't have ICCP, what does it have to be linked through so data is available? - Correct Answer ️️ -SCADA (through EMS) Which balancing control mode is used by PJM under normal operations? - Correct Answer ️️ -Tie line bias the purpose for balancing area to have AR (area regulator) is to correct for: - Correct Answer ️️ -small deviations in load what esuite tool is used to maintain individual generator regulation data that is submitted by PJM members? - Correct Answer ️️ -eMarket cold weather alert is for what temp? - Correct Answer ️️ -10F what are the three types of transmission constraint that PJM monitors? - Correct Answer ️️ -Reactive, Stability, Thermal (transfer limits) which would be the last step PJM would take in attempting to relieve a transmission constraint? - Correct Answer ️️ -shed load Load in PJM is generally served using ___ transmission service. - Correct Answer ️️ - Network Integration If you were going to import, export, or wheel power through PJM, you would use ____ transmission services? - Correct Answer ️️ -point-to-point? what is an example of a quick start reserve? - Correct Answer ️️ -Hydroelect

Show more Read less
Institution
PJM Generation
Course
PJM Generation










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM Generation
Course
PJM Generation

Document information

Uploaded on
June 5, 2024
Number of pages
16
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM Exam Que stions and Answers 100% Correct During reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO - Correct Answer ✔️✔️-TO Generation available within 10 minutes for offline reserve units: Quick -start (hydro), manual, operating, supplemental - Correct Answer ✔️✔️-Quick -start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? - Correct An swer ✔️✔️-20 MVA Minimum MVARs for an aggregate of generators that is required to do reactive testing? - Correct Answer ✔️✔️-75 MVA Power transformer is connected to the generator with which line? - Correct Answer ✔️✔️-
Primary In a balancing authority regi on, If a site trips offline, what increases? - Correct Answer ✔️✔️-positive time error How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? - Correct Answer ✔️✔️-6 hrs How does PJM avoid dealing with economic issues during t ransmission related constraints - Correct Answer ✔️✔️-cost (offer) capping generation If a generator doesn't have ICCP, what does it have to be linked through so data is available? - Correct Answer ✔️✔️-SCADA (through EMS) Which balancing control mode is u sed by PJM under normal operations? - Correct Answer ✔️✔️-Tie line bias the purpose for balancing area to have AR (area regulator) is to correct for: - Correct Answer ✔️✔️-small deviations in load what esuite tool is used to maintain individual generator r egulation data that is submitted by PJM members? - Correct Answer ✔️✔️-eMarket cold weather alert is for what temp? - Correct Answer ✔️✔️-10F what are the three types of transmission constraint that PJM monitors? - Correct Answer ✔️✔️-Reactive, Stability, Thermal (transfer limits) which would be the last step PJM would take in attempting to relieve a transmission constraint? - Correct Answer ✔️✔️-shed load Load in PJM is generally served using ___ transmission service. - Correct Answer ✔️✔️-
Network Integrat ion If you were going to import, export, or wheel power through PJM, you would use ____ transmission services? - Correct Answer ✔️✔️-point -to-point? what is an example of a quick start reserve? - Correct Answer ✔️✔️-Hydroelectric In order to lower system v oltage, ___ must decrease to decrease _____ - Correct Answer ✔️✔️-MW, MVAR what is PJM's reg requirement during a system restoration? - Correct Answer ✔️✔️-2% of current load During restoration conditions, what amount of load must be shed in order to incre ase frequency by 1.0Hz - Correct Answer ✔️✔️-6-10% During restoration conditions, what percentage of load must be shed in order to alter frequency by 1% Hz? - Correct Answer ✔️✔️-1-2% of load to alter frequency by 1% What is the approx. MVAR per mile of 50 0kV transmission that should be anticipated? - Correct Answer ✔️✔️-1.70 MVAR per mile Frequency during restoration process should be: - Correct Answer ✔️✔️-59.75 -61Hz A system will blackout at what frequency? - Correct Answer ✔️✔️-57.5 Hz or lower What is the criteria for PJM to issue a Min Gen Alert? - Correct Answer ✔️✔️-Within 2500 MW of normal eco min limits Based on a generator capability curve, in order to maximize the MVAR output of the generator, it may be necessary to: - Correct Answer ✔️✔️-decreas e MW output It would be an acceptable action for PJM to request of a generator during periods of heavy flows (load) and low voltages to lower real -time power output to ... - Correct Answer ✔️✔️-increase reactive power lowering the generator's current and increasing the voltage will also increase: - Correct Answer ✔️✔️-MVARs (reactive power) PJM dispatches supply resources in what order to meet customer demand? - Correct Answer ✔️✔️-lowest to highest cost If supply excee ds demand, what will system frequency be? - Correct Answer ✔️✔️-
greater than 60 Hz

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BrittieDonald Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
397
Member since
2 year
Number of followers
162
Documents
20438
Last sold
15 hours ago
BrittieDonald Study Solutions.

Get Help in Your Due Online and Actual Exams, Assignments with Well Researched and Up-to date Study Materials for Guaranteed Success

3.3

78 reviews

5
31
4
13
3
7
2
5
1
22

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions