PJM Generation Cert Questions and Answers 100% Correct
PJM Generation Cert Questions and Answers 100% Correct Actions in low voltage alert? - Correct Answer ️️ -Review transmission & generation outages Request reactive reserve check Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - Correct Answer ️️ -Bulk Power System Manual load dump warning & reduction of Non-critical plant load issued when? - Correct Answer ️️ -Primary reserve is less the the largest generating unit. Loss of transmission facility jeopardize reliability after all possible measures have been taken to increase reserves Hot weather alert - Correct Answer ️️ -COMED 90 DOM & EKPC 95 PJM issues high system voltage message - Correct Answer ️️ -Gen operators should operate the lower end of their voltage bandwidth Primary reserve warning - Correct Answer ️️ -Ensure deffer able Maintenance is halted General actions PJM takes when conservating ops initiated? - Correct Answer ️️ - Purchase/load additional reserves begin studying double contingencies Lower IROL Increase # of SOS calls Purpose of heavy voltage schedule action is to increase reactive reserves - Correct Answer ️️ -EHV system National terrorism advisory system 2 types of alerts? - Correct Answer ️️ -Elevated threat Imminent threat Non-critical plant load - Correct Answer ️️ -lighting, office area a/c Purpose of capacity emergency warning? - Correct Answer ️️ -keep members informed of actual capacity shortages or contingencies that may jeopardize reliability during RT ops keep all affected system personnel aware of the forecast and actual status of the PJM RTO Heavy load voltage schedule action - Correct Answer ️️ -Gen operators- maintain MVAR reserve on units connected to EHV During cold weather action - Correct Answer ️️ -Assume an unavailability rate for scheduled generation During terrorism/sabotage emphasis on? - Correct Answer ️️ -Operations & communications For voltage support TOs can request? - Correct Answer ️️ -Generators stay online During Restoration what is removed from service until sufficient load restored to maintain voltage - Correct Answer ️️ -Shunt capacitors Freq change=(load change/connected capacity)X Gov droop in percentage - Correct Answer ️️ - LMP calculated day ahead market - Correct Answer ️️ -Every hour RT every 5mins Penalty factor - - Correct Answer ️️ -incremental loss for a bus used to include the effect of losses on the dispatch All call types - Correct Answer ️️ -Operational, Emergency Messages, Informational Voltage reduction Alert- - Correct Answer ️️ -Est. operating reserve capacity is less than forecasted synchronized reserve equipment Generation owners - Correct Answer ️️ -Must handle environmental Alerts Emergency requires action to? - Correct Answer ️️ -Maintain freq prevent load loss, ensure safety and reliability Alerts - Correct Answer ️️ -Advance of operating day Warning & actions - Correct Answer ️️ -During that day Emergency situation - Correct Answer ️️ -Implement procedur
Written for
- Institution
- PJM Generation
- Course
- PJM Generation
Document information
- Uploaded on
- June 5, 2024
- Number of pages
- 23
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm generation cert questions and answers 100 cor
Also available in package deal