CDT exam Questions with Correct Answers (solved)
CDT exam Questions with Correct Answers (solved) 1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: a) Agreement. b) Conditions of the Contract. c) Division 01. d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c) Specifications. d) Summary of Work. - CORRECT ANSWER-c) Specifications. 3. The three essential considerations in the evaluation of a product are: a) Requirements, Criteria, and Tests. b) Costs, Maintenance, and Installation. c) Life Cycle Cost, Installation Cost, and Maintenance Cost. d) Case studies, Failures, and Problems. - CORRECT ANSWER-a) Requirements, Criteria, and Tests. 4. Whose responsibility is it to furnish the Shop Drawings? a) The Architect/Engineer b) The Contractor c) The Owner d) The Subcontractor - CORRECT ANSWER-b) The Contractor 5. The division of the Work among multiple prime Contracts is described in: a) Instructions to Bidders. b) Supplementary Conditions. c) Division 01. d) Special Conditions. - CORRECT ANSWER-c) Division 01. 6. During the Project Conception Stage, the A/E may be retained to: a) Develop outline specifications b) Describe the character of the mechanical system c) Prepare renderings d) Assist in financial feasibility studies - CORRECT ANSWER-d) Assist in financial feasibility studies 7. What is the main purpose of MasterFormat?
Written for
- Institution
- Cdt
- Course
- Cdt
Document information
- Uploaded on
- May 30, 2024
- Number of pages
- 16
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cdt exam questions with correct answers solved
-
the method of computation of contractors overhead
-
the three essential considerations in the evaluati
Also available in package deal