-CPE
3.Which A (Aging) indicator displays in the recoverable/ reparable conversion by YOBUX
TRANSATION IF THE RETURN (ZRL/ZRX) PR is 36 days old - ANSC. RED
4.What screen title displays in the initial screen of the migo transaction . - ANSA. The screen
title depends on the last movement type that was posted.
5.what is the menu path used to enter time confirmation and complete a work order. - ANSA.
Order>confirmation >overall completion confirmation
6.what number is associated with the status that is used to deadline the equipment. - ANSA. 30
7. When creating a dispatch (d1) notification , what cannot be done before the notification is
saved and the notification number is generated - ANSC .the equipment dispatch 5987 form
cannot be printed
What is the number of the inbound delivery that is associated with a dedicated order from
national - ANS180008205
What link should be clicked in the AIT application to perform a customer pick up at the Ssa and
to bring materials into the units inventory - ANSPgr
What materials is available for this issue to work order - ANS015954742
From an existing p.m. notification which button is selected to create the preventative
maintenance pmo2 to work order - ANSButton #2
In a maintenance notification where is the how recognize code selected - ANSIn the coding field
Which button do you click to display the listing of the classes of supply they can be requisition
by the MRP area - ANSExt. Matl group
What button is used to trigger the install/Dismantle process for the selected engine - ANSGoods
movement icon
What is the number of the return Zxs - pr that was created - ANS1000040425