NCIDQ IDFX Exam Questions with 100% correct Answers Latest Update 2024/2025 (100% Verified)
NCIDQ IDFX Exam Questions with 100% correct Answers Latest Update 2024/2025 (100% Verified) When does the designer transfer all warranties and manuals? - correct answer when the designer is the seller of the goods when goods are shipped FOB destination, who has the title to them while in transit? - correct answer the seller when goods are shipped FOB factory, who has the title to them while in transit? - correct answer the buyer (transfer when goods leave the manufacturer/seller) what is involved in the parameter method of costing? - correct answer an expanded itemization of construction quantities and furnishings and assignment of unit costs to these quantities. With this type of budgeting, it's possible to evaluate the cost implication of each building component and to make decisions concerning quantity and quality that meet the original budget estimate what is matrix costing? - correct answer a technique in which a matrix is drawn with various alternatives and the individual elements that combine to make up the total cost of the alternatives. what term describes the furniture sales agreement between the client and interior designer? - correct answer a propsal The risk for furniture being damaged during shipment is assigned by the ______ - correct answer Uniform Commercial Code (UCC) The client is most typically involved with procurement of furniture through what? - correct answer a sales agreement IDFX Exam Questions with 100% correct Answers Latest Update 2024/2025 (Verified) When specifying a specialty flooring material, the interior designer can obtain unbiased information on the hazards of a cleaning agent, required for maintenance, from the ______ - correct answer MSDS Which of the following is not part of interior design delivery service? - correct answer installation who is responsible for inspection of furniture delivered and final inspection of furniture installed? What constitutes "acceptance of" or "taking charge or control over the furniture"? - correct answer the owner; upon final written acceptance While the interior designer is not responsible for structural design, they can design details to accommodate building movement caused by all of the following EXCEPT what? - correct answer building expansion - Expansion joints must be designed into the original building structure by the architect. TRUE/FALSE: Special seismic design is required for the below ceiling types? 1. structures in seismic design category a or b 2. ceilings with areas less than 144 sq ft 3. gypsum wallboard suspensions systems 4. plaster and lath ceilings - correct answer FALSE the measurement of business based on profit, planet, and people is known as what? - correct answer the triple bottom line Who would be responsible for scheduling the asbestos field test for the renovation of a building built in 1972? - correct answer contractor Utilizing BOMA standards, gross building area for a two-story building leased to a single tenant is measured: - correct answer To the outside face of the building and includes all interior area In designing the new office space for a client, the lease indicates there is 8,000 square feet of rentable space available to use to develop the office. This area _______ A. contains the corridors, restrooms and elevator lobbies B. contains the floor space within the exterior face of the building including the exterior wall C. is the floor area inhabitable by the tenant D. is the interior floor area excluding vertical penetrations through the floor - correct answer D buildings constructed prior to what year are likely to contain spray-on fireproofing and insulation containing asbestos? - correct answer 1973 Direct space adjacencies would be LEAST necessary in which business type? - correct answer Amazon customer service call center if a bidder requests a substitution during the bidding process, what must the interior designer do? A. forward request to owner for approval. If approved, issue change order stating this and sent to all bidders B. nothing, substitution requests are not considered until after the bid has been awarded C.review submission, approve or reject it, if approved issue addendum stating this and send to all bidders D. research proposed substitution to determine if it is acceptable, approve or reject substitution request, issue a change order stating this and send to all bidders - correct answer C What is the primary purpose of a retainage? - correct answer To protect the owner against defective and incomplete work who is responsible for submitting the Certificate of Occupancy (CO) to the owner? - correct answer contractor Who should be present at the final design development presentation for changing the office layout? A.project manager, office manager, design principal, facility manager
Written for
- Institution
- NCIDQ IDFX
- Course
- NCIDQ IDFX
Document information
- Uploaded on
- May 28, 2024
- Number of pages
- 36
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- idfx
- ncidq idfx
- latest updated 2024
- graded
- verified answers
-
ncidq idfx exam questions with correct answer
Also available in package deal