OSHA 30 Module 7: Overhead & Gantry Cranes - Correct Crane Steps Exam 100% Solved Inspect to ensure compliance with hoisting and lowering mechanism, trolley travel, bridge travel, limit switches, locking, and safety devices conducting a load test of not more than 125% of rated load. - answer1 To operate the crane, choose only a trained employee knowledgeable about crane operation, hazards, repair, and the standard hand signals for controlling for controlling overhead and gantry cranes. - answer2 Before hoisting, conduct a visual inspection of all functional operating mechanisms, air or hydraulic systems, hooks, hoist ch