Combo with "EXAM 200" Questions With All Complete And Verified Solution/Distinction Graded/2024.
Which of the following best describes the project delivery system being used to build the 49er's Stadium - correct answer Integrated Bridging Design Build Build a charter school with six classrooms that will accommodate 32 students per classroom - correct answer performance requirements Maximum predictability of end product - correct answer prescriptive requirements Furnish labor, tools and equipment as required to provide a 6" thick monlithic slab-on-grade using 3000 PSI concrete , 6x6 welded wire fabric, 1" of sand over visquene, over 4" of washed aggregate - correct answer prescriptive requirement Build an office building to house a center for workforce development activities - correct answer functional requirement Include two Thyssen Krupp Model No. AMEP25 HLS elevators - correct answer prescriptive requirement Design documents providing exactly what the facility will look and be constructed - correct answer prescriptive requirement Open office areas are needed on the first and second floors to accommodate 100 daaprocessors in 6'-0" x 6' -0" work stations per floor - correct answer performance requirement Vertical transportation systems between floors requested - correct answer functional requirement Provide vertical transportation to accommodate the moving of 500 tenants daily - correct answer performance requirement Selection process in which qualitative proposals are submitted separately from the price proposals - correct answer Two envelope proposal Owner and D-B firm negotiates a contract based on subjective and qualitative factors - correct answer Qualifications based selection Awarded to the proposer with the highest combined total points of technical and price proposals - correct answer Weighted Criteria Selection in which qualitative aspects are scored on a 0 to 100 scale and expressed as decimal then bid price is then divided by the qualitative score to yield an "adjusted" low bid - correct answer Adjusted Low Bid Any selection process in which the proposal contains both price and qualitative components, and award is based upon a combination of price and qualitative considerations - correct answer Best Value selection Should be established and in place before deciding to pursue a project - correct answer Teaming agreement The single most important distinction about design-build - correct answer Team Approach Finding the holes between the design and use processes and filling them - correct answer Gap Management Thinking through and seeking solutions regardless of your training providing multiple perspectives to solving problems - correct answer Interdisciplinary Fluency Multi-disciplined, collaborative approach to the way a project team relates. - correct answer Integrated services Cost and performance are fixed - correct answer Design Build Design dictates cost and performance is a variable - correct answer Design Bid Build Constructor establishes design parameters for architect - correct answer Design Build Owner is not liable for any "gaps" between the plans and specs and the requirements for performance - correct answer Design Build Owner warrants the sufficiency of the plans and specs to the contractor - correct answer Design Bid Build (T/F) In DB the Owner controls the details of the design - correct answer False (T/F) According to DBIA, lack of communication is the number one reason why teams fail - correct answer False The _______ is responsible for choosing a selection panel who help decide which proposer wins the award of a project. - correct answer Owner Under DB project delivery, the _______ owns the "details" of the design. - correct answer Design-Build Entity (T/F) When using a "Best Value Criteria Matrix," the proposer/design-build entity with the lowest price proposal in their bid wins the award. - correct answer False (T/F) An essential concept of DB is the there are multiple points of responsibility - correct answer True (T/F) The Master Format (CSI) is the estimating format used primarily for detailed estimating - correct answer True In determining the Selection panel, the ideal size for most projects is ________ people - correct answer 4-6 (T/F) Under DB the DB'er warranties all plans and specifications used for the project including bridging documents - correct answer False
Written for
- Institution
- DBIA.
- Course
- DBIA.
Document information
- Uploaded on
- May 11, 2024
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal