MSSC Maintenance test 1 questions and answers all are graded A+
What is an accelerometer used for? - Temperature measurement - Acoustic monitoring - Vibration measurement - Oil analysis - Answer-Vibration measurement Corrective work is performed following preventive maintenance when __________. - The schedule calls for it - The supervisor requests it - The PM work was performed incorrectly - Problems are discovered - Answer-Problems are discovered Slips and falls are the worst safety hazards when __________. - Cleaning fans - Mopping floors - Lifting heavy objects - Driving a tug - Answer-Mopping floors Supply errors can be caused by relying on __________ without monitoring their performance. - Customers - Employees - Suppliers - Inspectors - Answer-Suppliers Preventive maintenance is best described as what? - Periodic in nature- Exhausting - Breakdown repair - Flexible - Answer-Periodic in nature A board with tool outlines for placement is called a __________ and is a good way to make sure tools are returned to their proper storage space between uses. - Storyboard - Shadow board - Board of tools - Storage bin - Answer-Shadow board The frequency of maintenance is usually an item found on the __________. - Preventive maintenance schedule - Work order - Warranty card - Hold card - Answer-Preventive maintenance schedule A maintenance technician should arrange to have all routine tools and supplies ready to perform preventive maintenance on a machine in order to __________. - Increase equipment downtime - Minimize equipment downtime - Make sure that the job is done correctly - Make sure that the machine parts are still available - Answer-Minimize equipment downtime Placing tools and equipment where they can be reached with minimal strain is a characteristic of a __________. - Poorly designed workstation - Well-designed workstation - Old style workstation - Pull system - Answer-Well-designed workstationWhat can be done after a corrective action form is completed? - The form is saved in a safe and secure place. - The maintenance technician reviews the work order. - The supervisor is summoned to determine whether the job is complete. - Preventive maintenance should be documented as completed. - Answer-Preventive maintenance should be documented as completed. The first thing an employee should do when discovering a building maintenance issue that negatively impacts his/her work area is __________. - Report the situation to the supervisor - Try to fix the problem - Go home until the problem is fixed - Ignore the problem - Answer-Report the situation to the supervisor How often the maintenance will occur is the primary consideration of what type of maintenance? - Predictive - Reactive - Responsive - Preventive - Answer-Preventive Reactive Maintenance is considered a(n) __________ activity. - Unplanned maintenance - Planned maintenance - Highly responsive maintenance - Chemical-related maintenance - Answer-Unplanned maintenance In a well-organized plant, it should take a worker __________ to find the right tool. - 30 seconds- 1 minute - 5 minutes - 10 minutes - Answer-30 seconds
Written for
- Institution
- MSSC Maintenance
- Course
- MSSC Maintenance
Document information
- Uploaded on
- May 10, 2024
- Number of pages
- 30
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal