100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

MSSC Maintenance test 1 questions and answers all are graded A+

Rating
4.0
(1)
Sold
1
Pages
30
Grade
A+
Uploaded on
10-05-2024
Written in
2023/2024

What is an accelerometer used for? - Temperature measurement - Acoustic monitoring - Vibration measurement - Oil analysis - Answer-Vibration measurement Corrective work is performed following preventive maintenance when __________. - The schedule calls for it - The supervisor requests it - The PM work was performed incorrectly - Problems are discovered - Answer-Problems are discovered Slips and falls are the worst safety hazards when __________. - Cleaning fans - Mopping floors - Lifting heavy objects - Driving a tug - Answer-Mopping floors Supply errors can be caused by relying on __________ without monitoring their performance. - Customers - Employees - Suppliers - Inspectors - Answer-Suppliers Preventive maintenance is best described as what? - Periodic in nature- Exhausting - Breakdown repair - Flexible - Answer-Periodic in nature A board with tool outlines for placement is called a __________ and is a good way to make sure tools are returned to their proper storage space between uses. - Storyboard - Shadow board - Board of tools - Storage bin - Answer-Shadow board The frequency of maintenance is usually an item found on the __________. - Preventive maintenance schedule - Work order - Warranty card - Hold card - Answer-Preventive maintenance schedule A maintenance technician should arrange to have all routine tools and supplies ready to perform preventive maintenance on a machine in order to __________. - Increase equipment downtime - Minimize equipment downtime - Make sure that the job is done correctly - Make sure that the machine parts are still available - Answer-Minimize equipment downtime Placing tools and equipment where they can be reached with minimal strain is a characteristic of a __________. - Poorly designed workstation - Well-designed workstation - Old style workstation - Pull system - Answer-Well-designed workstationWhat can be done after a corrective action form is completed? - The form is saved in a safe and secure place. - The maintenance technician reviews the work order. - The supervisor is summoned to determine whether the job is complete. - Preventive maintenance should be documented as completed. - Answer-Preventive maintenance should be documented as completed. The first thing an employee should do when discovering a building maintenance issue that negatively impacts his/her work area is __________. - Report the situation to the supervisor - Try to fix the problem - Go home until the problem is fixed - Ignore the problem - Answer-Report the situation to the supervisor How often the maintenance will occur is the primary consideration of what type of maintenance? - Predictive - Reactive - Responsive - Preventive - Answer-Preventive Reactive Maintenance is considered a(n) __________ activity. - Unplanned maintenance - Planned maintenance - Highly responsive maintenance - Chemical-related maintenance - Answer-Unplanned maintenance In a well-organized plant, it should take a worker __________ to find the right tool. - 30 seconds- 1 minute - 5 minutes - 10 minutes - Answer-30 seconds

Show more Read less
Institution
MSSC Maintenance
Course
MSSC Maintenance










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MSSC Maintenance
Course
MSSC Maintenance

Document information

Uploaded on
May 10, 2024
Number of pages
30
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Reviews from verified buyers

Showing all reviews
1 year ago

4.0

1 reviews

5
0
4
1
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1845
Member since
2 year
Number of followers
1043
Documents
22445
Last sold
6 hours ago

3.8

320 reviews

5
148
4
61
3
54
2
16
1
41

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions