ACI Flatwork Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version
It is important that the ____________ __________ read and understand project specifications. - finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. - 100 Concrete is sold by the ton? - False Delays in discharging concrete trucks can result in the concrete being hard to: - pump, place, and finish When there is room for two concrete trucks ready to discharge into a pump hopper, placement is faster because: - as one truck is finishing, the other is ready to unload the concrete Concrete from a ready mix truck must usually be completely discharged within _____ hours after water has been added at the plant. - 1.5 You can tell when water has been added to the concrete truck by looking at the: - batch ticket When concrete for a slab placement will be discharged from the truck chute, truck arrivals should usually be spaced at about: - 15 minutes When finishers get behind because the concrete is setting faster than expected and the placing crew is also shorthanded, one solution is slowing the concrete delivery rate to match worker output. - TrueIn deciding how much concrete to order for a floor placement, you should calculate the number of cubic yards needed to fill the forms, then order two to three cubic yards less so you don't waste concrete that is not needed. - False
Written for
- Institution
- ACI Flatwork
- Course
- ACI Flatwork
Document information
- Uploaded on
- May 7, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci flatwork questions answers 100 correct an
Also available in package deal