ACI Concrete Field Testing Technician- Grade I|141 Questions with 100% Correct Answers | Verified | Latest Update |2024
The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - ️️3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ️️1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - ️️Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - ️️True The temperature of concrete may be measured in a wall form. True of False - ️️True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - ️️False What must be done to the sample container prior to sampling the concrete? - ️️Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - ️️Gently press the concrete around the temperature measuring device at the surface of the concrete
Written for
- Institution
- ACI FIELD 1
- Course
- ACI FIELD 1
Document information
- Uploaded on
- April 29, 2024
- Number of pages
- 15
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade i