AIC Exam #2 Practice Questions and Answers 100% Pass
AIC Exam #2 Practice Questions and Answers 100% Pass What is the name of the law principle for referring the Contractor to other documents that are not contained in the package provided? - Correct Answer ️️ -Incorporated by Reference. Which document issued by the Architect illustrates what is to be built? - Correct Answer ️️ -Plans Which document describes quality of work and the quality of the materials and the construction execution procedures? - Correct Answer ️️ -Technical Specifications. Which document specifies the temporary facilities needed on a project? - Correct Answer ️️ -General Requirements. Which document specifies the Regulations required such as soil erosion or minorities? - Correct Answer ️️ -General Requirements. Which document describes the duties and responsibilities of each party and the business procedures for administering the contract? - Correct Answer ️️ -General Conditions Which of the following documents are submitted by the Contractor at bid opening? - Correct Answer ️️ -Proposal Form, Bid Breakdown, Addendum, Bid Bond & Noncollusive Affidavit. Which document requests that additional information be submitted by the bidder within 48 hours of bid opening? - Correct Answer ️️ -Proposal Supplements Which document applies to the Contractor and the Subcontractors and describes the administrative, procedural and temporary procedures on the job site? - Correct Answer ️️ -General Requirements What types of projects establish prevailing wage rates? - Correct Answer ️️ -Federally Funded Projects Which of the following documents is normally incorporated by reference? - Correct Answer ️️ -General Conditions Which document describes the business procedures for a specific project and they change the initial procedures? - Correct Answer ️️ -Supplementary Conditions Which document is submitted to the Owner for bid consideration before the Contractor can receive the bidding documents? - Correct Answer ️️ -Pre-qualification Forms. Which document makes changes, modifications and corrections prior to bid opening? - Correct Answer ️️ -Addenda Which document specifies the existing soil conditions? - Correct An
Written for
- Institution
- AIC
- Course
- AIC
Document information
- Uploaded on
- April 28, 2024
- Number of pages
- 31
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aic exam 2 practice questions and answers 100 pa
Also available in package deal