PJM Generation Operation Exam 2024 with Verified Solutions
PJM Generation Operation Exam 2024 with Verified Solutions Control center facilities must have a minimum of how many days of fuel for the backup generator? 5 days If PJM ACE shows overgeneration, actual imports are: Less than scheduled Who should a generator contact at PJM to clear an outage ticket? Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: +/-.02 Hz What frequency would PJM set to correct for fast-time error? 59.98Hz What frequency would PJM set to correct for slow-time error? 60.02Hz What info is on an instantaneous reserve check? synchronized (regulating and non- regulating), quick start, secondary and beyond secondary reserves Generators must provide PJM with a realistic Reactive Capability Curve. This curve must have no less than __ points, and no more than __ points. No less than 2 and no more than 8 points A classic indicator of voltage instability is when system voltages change greatly when... system loads change by a small amount Above the line of a D-curve... Lagging (pushing VARs). Generators will be set there during high-load/low voltage conditions. Below the line of a D-curve... Leading (absorbing VARs). Generators will be set there during low load/high voltage conditions. MWs and MVARs have what kind of relationship? Inverse (increase in MW = decrease in MVARs) How often do generators need to test reactive power capability? Every 5 years The computer hardware and software at each control center shall achieve an availability level of what for those reliability functions directly affect the successful operation of PJM? 99.95% What is EHV? Extra high voltage. Classified as 345kv and above Any generator that is a PJM generation capacity resource that has an RPM Resource Commitment: 1. Must submit an offer schedule into the DA market even if it is self- scheduled or unavailable due to outage 2. Generation capacity resources shall submit: -A schedule of availability for the next seven days -May submit non-binding offer prices for the days beyond the next Operating Day What time period is the Market Participant Bid/Offer Period? What time are DA Market results posted? 1330 What time period is the re-bid period? What is the maximum for a generation capacity resource offer? $2000/MWh What is the cap for price-based offers? Price-based offers will be capped at the lower of $2000/MWh or the corresponding cost-based offer when costs are above $1000/MWh Example: If a unit's cost is $1500, the price offer can
Written for
- Institution
- PJM Generation
- Course
- PJM Generation
Document information
- Uploaded on
- April 24, 2024
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm generation operation exam 2024 with verified
Also available in package deal