PJM Flash Card Transmission Questions and Answers Already Passed
PJM Flash Card Transmission Questions and Answers Already Passed What would be an appropriate action for a transmission system operator to implement during a PJM issued cold weather alert? Man all combustion turbines Man all transmission facilities Defer or cancel facility maintenance and testing Open all SF6 circuit breakers Defer or cancel facility maintenance and testing During restoration situations, dynamic reserve generator load pick-up factors are defined as which of the following? Steam capacity - 25%, Combustion Turbine capacity - 15%, and hydro capacity - 5% Steam capacity - 5%, Combustion Turbine capacity - 15%, and hydro capacity - 25% Steam capacity - 5%, Combustion Turbine capacity - 25%, and hydro capacity - 15% Steam capacity - 15%, Combustion Turbine capacity - 10%, and hydro capacity - 25% Steam capacity - 5%, Combustion Turbine capacity - 25%, and hydro capacity - 15% Generation is supposed to be disconnected from the system at which of the following frequencies? 57.5 Hz 58.5 Hz 58.9 Hz 59.3 Hz 57.5 Hz According to PJM emergency procedures, if PJM requests a 300 MW load dump, the member company operators in the Mid-Atlantic Region are obligated to Get management approval to dump load Dump 300 MW of load Dump load in accordance with the allocation table Dump 10% of the 300 MW Dump load in accordance with the allocation table PJM issues a Cold Weather Alert when the forecasted temperature across the RTO or a Control Zone is expected to be less than or equal to: 0 degrees Fahrenheit 5 degrees Fahrenheit 10 degrees Fahrenheit 32 degrees Fahrenheit 10 degrees Fahrenheit What is the typical concern that the system operator should have during restoration when restoring transmission facilities with little or no connected load? Low voltage High voltage Low frequency High frequency High voltage Which of the following actions must PJM member operators do during thunderstorm and tornado type weather conditions? Remove reclosing relays schemes from service Ensure automatic reclosing schemes are in service Remove all generators loaded below 20% from service Ensure that underfrequency relays are disabled Ensure automatic reclosing schemes are in service How long does PJM have to return operation to within reliable power system limits due to a catastrophic failure of the ICCP links or loss of EMS analysis tools? 5 minutes 15 minutes 30 minutes 60 minutes 30 minutes When PJM issues a Voltage Reduction Alert, which of the following is NOT an appropriate action for a Member dispatcher to take? Take steps to expedite the reduction, if needed Advise all station and key personnel Notify management Implement the voltage reduction without delay Implement the voltage reduction without delay If the rule of thumb for dumping load to increase frequency during system restoration is 6% per 1 Hz, how many MW should the operator shed to restore frequency to 60.0 Hz if their current system load is 2000 MW and the current system frequency is 58.5 Hz? 60 120 180 240 180 PJM restoration procedures stress the importance of restoring station light and power to substations. This is important for providing AC power to all of the following EXCEPT Station battery chargers Communication facilities SF6 heaters Power house lighting
Written for
- Institution
- PJM Flash Card Transmission
- Course
- PJM Flash Card Transmission
Document information
- Uploaded on
- April 24, 2024
- Number of pages
- 88
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm flash card transmission questions and answers
Also available in package deal