Maryland asbestos exam Guide 2024/2025
Maryland asbestos exam Guide 2024/2025 The lean ratio of an extension ladder - CORRECT ANSWER-4:1 According to a Hera, to complete a response action of a non-NESHAP size project how many samples must be taken with results of what? - CORRECT ANSWER-5 samples taken inside with results of each 0.0 f/cc What are the notification requirements in Virginia? - CORRECT ANSWER-20 calendar days for any project greater than 10 ft.² or linear feet In what US jurisdiction do individuals need an asbestos supervisor or working license? - CORRECT ANSWER-Need a license everywhere Type of bond that would ensure that the general contractor will compensate sub contractors for labor and materials? - CORRECT ANSWER-Performance bond Minimum respiratory protection on a class one asbestos project with no NEA? - CORRECT ANSWER-Full face air, purifying respirator What is the maximum content permitted in the work area where an air purifying respirator is being worn? - CORRECT ANSWER-23.5% Xrays must be evaluated by what class reader? - CORRECT ANSWER-Class B What is the APF for a full face air purifying respirator? - CORRECT ANSWER-50
Written for
- Institution
- Asbestos supervisor
- Course
- Asbestos supervisor
Document information
- Uploaded on
- April 17, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- the definition of pacm is
-
maryland asbestos exam guide
-
the lean ratio of an extension ladder
-
according to osha construction standards fall pro
Also available in package deal