100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

WGU C722 2024 QUESTIONS WITH COMPLETE ANSWERS ALREADY PASSED AND GRADED A+

Rating
-
Sold
1
Pages
44
Grade
A+
Uploaded on
16-04-2024
Written in
2023/2024

WGU C722 2024 QUESTIONS WITH COMPLETE ANSWERS ALREADY PASSED AND GRADED A+












Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
April 16, 2024
Number of pages
44
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • wgu c722 2024

Content preview

WGU C722 2024 QUESTIONS WITH COMPLETE
ANSWERS ALREADY PASSED AND GRADED A+
Three essential drivers that must be achieved to generate positive characteristics in

project teams - CORRECT ANSWER Cohesiveness, Trust, Motivation

The five stages Dr. Bruce Tuckman (1965) introduced of group development -

CORRECT ANSWER Forming, Storming, Norming, Performing, Adjorning

Forming - CORRECT ANSWER In this stage, team members may be meeting for

the first time. Often, no one really knows much about anyone else on the team. It may be

premature to refer to this group of individuals as a team. It is a time of introduction and

forming relationships and understanding from exchange of information.

Storming - CORRECT ANSWER Team members are beginning to know about each

other, but they do not yet understand how to work together. Members may "jockey for

position" within the team. The dynamics of working together beyond any written

statement of "roles and responsibilities" are being established. Personalities surface,

showing the strengths, weaknesses, and personal needs of each individual on the team.

Integration into a team may come with some struggle and conflict.

Norming - CORRECT ANSWER Team members have "figured out" how they will

interact with each other. Working relationships are beginning to form. Trust and

understanding is beginning to form between team members. They are beginning to feel

comfortable working together and openly and willingly sharing information.

,WGU C722 2024 QUESTIONS WITH COMPLETE
ANSWERS ALREADY PASSED AND GRADED A+
Performing - CORRECT ANSWER Team members are fully comfortable working

together. Trust has been developed. Working relationships have jelled. Work is being

conducted and project progress is occurring.

Adjourning - CORRECT ANSWER This only occurs when all the team's work has

been completed and the team is no longer required. This may occur at any time in the

project life cycle.

Co-located Teams - CORRECT ANSWER involves team members physically

working at the same location or holding project meetings together in a common setup.

Virtual Teams - CORRECT ANSWER are teams whose members interact primarily

through electronic communications. Members of a virtual team may be within the same

building or across continents.

Two common situations occur that may prompt a change to the baseline scope -

CORRECT ANSWER The scope may be expanded to include additional functionality

or the scope may be diminished due to changes in the project environment such as

reduced funding or requirements or changing time/due date.

Scope creep - CORRECT ANSWER occurs when the project team integrates

enhancements to the scope without proper evaluation and approval.

work performance data - CORRECT ANSWER will identify the work activities that

are completed, partially completed, or not started.

,WGU C722 2024 QUESTIONS WITH COMPLETE
ANSWERS ALREADY PASSED AND GRADED A+
risk register - CORRECT ANSWER is a list of potential risks, how the risks will be

monitored, and what action will be taken should the risk event occur.

corrective action - CORRECT ANSWER is a document issued to identify quality

failures and how they will be corrected. The deliverable itself may need to be reworked

and the project plan may need to be revised to ensure that future deliverables do not

include the same error.

The Four Categories of Change - CORRECT ANSWER Contingency plans,

improvement changes, external events, scope change

The change management system - CORRECT ANSWER is in place to formally

identify, evaluate, decide, and communicate project changes.

Recording - CORRECT ANSWER is the process of documenting and archiving

project-related information.

Reporting - CORRECT ANSWER is a key nonverbal communications methodology

used to inform and to document project information.

Weekly status reports that are often working documents for the team to communicate: -

CORRECT ANSWER Accomplishments, Issues, Schedules, Resource utilization

Monthly status reports for senior stakeholders that would include: - CORRECT

ANSWER Project overview bragging about progress, Issues including red light

(critical) problems needing immediate resolution, yellow light items that are warning

, WGU C722 2024 QUESTIONS WITH COMPLETE
ANSWERS ALREADY PASSED AND GRADED A+
flags, and resolved issues, Current accomplishments, Future plans for the next month,

Resource utilization and plans

Monthly Financial Report - CORRECT ANSWER showing progress against the

budget quantifying monies spent and planned to be spent and identifying issues with

recommendations for resolution

Change management reporting - CORRECT ANSWER showing changes identified,

requiring approval, and resolution.

Project controls - CORRECT ANSWER are the data gathering, management, and

analytical processes used to predict, understand, and constructively influence the time

and cost outcomes of a project or program.

Three Aspects of Project Quality - CORRECT ANSWER quality management,

quality assurance, and quality control.

Quality management - CORRECT ANSWER is the process of identifying the

customer's requirements and how they will be measured.

Quality assurance - CORRECT ANSWER is the process of validating that the

requirements and measurements are appropriate for the project environment.

Quality control - CORRECT ANSWER is the process of monitoring and changing

project execution to ensure that activities are being executed as planned and will result in

meeting the customer requirements. It is the monitoring and controlling process that

occurs during project execution.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
mavericpapers NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
114
Member since
2 year
Number of followers
51
Documents
783
Last sold
5 days ago
Mavericpapers

The exclusive source well researched test banks and Exams. Get immediate access to a variety of learning tools, sample exams, and study guides created to help learners. With the vast array of text-based materials available at Mavericpapers you can increase your knowledge, ace tests, and gain confidence Thank you

3.8

22 reviews

5
13
4
1
3
3
2
1
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions