100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CDT Exam Questions With 100% Correct Answers 2024

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
14-04-2024
Written in
2023/2024

CDT Exam Questions With 100% Correct Answers 2024 Who is part of the project team? - answerOwner, Designer, Contractor, Supplier Responsibilities of the Owner - answerinitiates project and assumes risk Responsibilities of the Designer - answerplanning, reflects owner's vision, codes and regulations, construction documents, contract, QA/QC Responsibilities of the Contractor - answerestimates cost, time, manages construction Responsibilities of the Supplier - answerproduce equipment, products, and materials Four C's of Communication - answerClear, Concise, Correct, Complete Stages of the Facility Life Cycle - answer1. Project Conception 2. Design 3. Construction Documents 4. Procurement 5. Construction 6. Facility Management Four Considerations to be Identified in Facility Programming - answerfunction, form, economy, time Service Life Definition - answerperiod in which a structure remains usable for an intended purpose Factors Affecting Built Element Performance - answeramenity and comfort, durability, health and safety, structure, operational maintenance Types of Studies and Investigations - answerexisting facility evaluation, hazard materials evaluation, geotechnical investigation, environmental studies, archeological studies, community impact studies, financial studies What are hard costs? - answertangible costs (construction) What are soft costs? - answernon-tangible costs (design, plans, specs) Types of bonds - answerbid bonds, performance bonds, payment bonds Project schedule VS Construction schedule - answerProject schedules are developed during project conception and address items such as programming, site studies and acquisition, design and other activities. Construction schedules are developed by the contractor and are one part of the overall project schedule. Methods technique (used to develop project schedules) - answerestablishes required date of occupancy or use, identifies all preceding milestone dates by working backward Critical path method (used to develop project schedules) - answerdetermines activities that are dependent on each other, determines longest path for completion of those activities Examples of Due Diligence - answerhazardous material evaluation, geotechnical investigations, environmental studies, archeological studies, community impact studies What do site surveys show? - answerproperty lines, topographical contours, benchmarks, spot grade elevations, adjoining street, existing structure, fences and walls, location of soil contamination, easement and row, zoning classifications, location of flood plain, location of trees, description and location of natural features, encroachments definition of easement - answerrestrictions, property containing easements is owned by the owner but buildings cannot be built on that portion of the property types of commissioning - answertotal project, systems and equipment, building envelope definition of commissioning - answerquality oriented process that achieves, verifies, and documents performance of facilities, systems, and assemblies 3 principles of the commissioning process - answerdetermining project performance requirements, planning the commissioning process, document compliance and acceptance 3 factors of quality - answercost, extent, and time project management options - answerconstruction manager as agent, construction manager as advisor, program management Selection of an A/E - answerdirect selection, qualifications based, fee based, design competitions Selection of Contractor - answerlowest bid, best value/fee, qualifications based, best value/total cost definition of partnering - answerconcept of teamwork, team participants set priorities and goals to ensure cooperative efforts definition of collaboration - answerreflects need to work together cooperatively, may be as simple as people working together as a team

Show more Read less
Institution
CDT
Course
CDT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CDT
Course
CDT

Document information

Uploaded on
April 14, 2024
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Fyndlay Kaplan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
358
Member since
1 year
Number of followers
80
Documents
18668
Last sold
2 days ago
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3.7

68 reviews

5
32
4
8
3
13
2
6
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions