AMT2 practice questions and answers 2024/2025 latest
AMT2 practice questions and answers 2024/2025 latest WHO monitors and regulates power demands for the 25 cycle power system - CORRECT ANSWER-Load dispatcher Who is responsible for the movement of trains within an assigned territory - CORRECT ANSWER-Train dispatchers Which of the following is an apparatus which serves to increase or decrease voltage - CORRECT ANSWER-Transformer What class of employee is trained and qualified to provide protection and work on or about the electrification system - CORRECT ANSWER-Class A Which catenary system is a fixes system of wires suspended between poles and bridges - CORRECT ANSWER-Fixed tension Which catenary system is a system of wires provided with balance weight tensioning devices - CORRECT ANSWER-Constant tension Who is in charge of the electrification system within their assigned territory - CORRECT ANSWER-Power director Class c employees must take and pass an examination on AMT2 how often - CORRECT ANSWER-Every two years Any occurrence or condition which could affect the electric operation must be reported to - CORRECT ANSWER-Power director/ train dispatcher What is the voltage in transmission line - CORRECT ANSWER-138,000 volts What is the minimum approach distance for transmission line - CORRECT ANSWER15ft for equipment 8ft employees What is the voltage in catenary line - CORRECT ANSWER-12,000 volts Minimum approach distance for catenary - CORRECT ANSWER-3ft What is the voltage for signal line - CORRECT ANSWER-6900 volts
Written for
- Institution
- AMT2
- Course
- AMT2
Document information
- Uploaded on
- April 13, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
amt2 practice questions and answers lat
-
who monitors and regulates power demands for the 2
-
what is the voltage for signal line
-
who must be notified when entering any substation
Also available in package deal