ACI- Concrete Field-Testing Technician - Grade 1 Complete Questions & Answers 100% Verified
ACI- Concrete Field-Testing Technician - Grade 1 Complete Questions & Answers 100% VerifiedACI- Concrete Field-Testing Technician - Grade 1 Complete Questions & Answers 100% VerifiedACI- Concrete Field-Testing Technician - Grade 1 Complete Questions & Answers 100% Verified Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - ANSWER B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes.
Written for
- Institution
- ACI- Concrete Field-Testing Technician
- Course
- ACI- Concrete Field-Testing Technician
Document information
- Uploaded on
- April 12, 2024
- Number of pages
- 29
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade 1 c
-
aci concrete field testing technician stuvia
-
q1 start molding specimens for strength tests wit
Also available in package deal