Clc 222 Exam 1 Questions With Complete Solutions Rated A + 2024.
Notice to Proceed - Answer Authorizes that project is beginning and contractor can take over site and begin spending money. This establishes the reference date 4 M's of Construction - Answer Money, Materials, Manpower, Machines Letter of Intent - Answer may be issued to a contractor by owner before contract documents are available and cannot be enforced, states intention of the project Conceptual Drawings - Answer Including but not limited to architectural renderings, 3D layout, BIM, Steps in Project Development - Answer 1. Establishing Need 2. Conceptual Drawings & Parametric Estimates 3. Preliminary and Detail Design 4. Bid Package 5. Decision to release for bid 6. Advertise notice to bidders 7. Bid Period (Receipt of proposals) 8. Select contractor 9. Notice to proceed 10. Construction period 11. Inspection & acceptance of project Design Information - Answer Integrated drawings, set of specifications, detailed estimate (+ or - 10% including direct cost or indirect cost)
Written for
- Institution
- CLC 222
- Course
- CLC 222
Document information
- Uploaded on
- April 12, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers