100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Naslca Virginia Exam Practice Best Graded Questions and Answers

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
04-04-2024
Written in
2023/2024

All Class A contractor licensure applications MUST include - ANSWER-information on the knowledge, skills, and abilities of the applicant. What is the PRIMARY purpose of licensing? - ANSWER-Protect the health and welfare of the public. When a claimant is paid funds from the Contractors Recovery Trust Fund - ANSWER-the contractor's license is revoked. !!! The application for licensure MUST include - ANSWER-the business address of the proposed designated employee. Which of the following is a requirement for a joint venture? - ANSWER-Either the joint venture or each contracting party of the joint venture must be licensed. All of the following must be licensed EXCEPT - ANSWER-a material supplier who advises a contractor. How much is the Class A initial license fee? - ANSWER-$200 A licensee's name change MUST be reported to the Board within a MAXIMUM of how many days? - ANSWER-30 days According to the Board Rules and Regulations, a full-time employee is one who works a MINIMUM of how many hours per week? - ANSWER-30 hours. A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net worth of - ANSWER-$15,000. According to the Board Rules and Regulations, which of the following could be a qualified individual? - ANSWER-Any full-time employee. An appeal of the local building official's decision to refuse to grant a modification to the USBC MUST be made to the local building board within a MAXIMUM of how many days? - ANSWER-90 days. A building official MUST issue a certificate of occupancy for a building that meets all the requirements for a certificate within a MAXIMUM of how many working days after the certificate was requested? - ANSWER-5

Show more Read less
Institution
Naslca Virginia
Course
Naslca Virginia









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Naslca Virginia
Course
Naslca Virginia

Document information

Uploaded on
April 4, 2024
Number of pages
13
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Naslca Virginia Exam Practice Best
Graded Questions and Answers
What is the MAXIMUM penalty for a contractor who undertakes work without the
proper class of license? - ANSWER-$500 fine per day for each day of violation plus
penalties for a misdemeanor.

All Class A contractor licensure applications MUST include - ANSWER-information
on the knowledge, skills, and abilities of the applicant.

What is the PRIMARY purpose of licensing? - ANSWER-Protect the health and
welfare of the public.

When a claimant is paid funds from the Contractors Recovery Trust Fund -
ANSWER-the contractor's license is revoked. !!!

The application for licensure MUST include - ANSWER-the business address of the
proposed designated employee.

Which of the following is a requirement for a joint venture? - ANSWER-Either the
joint venture or each contracting party of the joint venture must be licensed.

All of the following must be licensed EXCEPT - ANSWER-a material supplier who
advises a contractor.

How much is the Class A initial license fee? - ANSWER-$200

A licensee's name change MUST be reported to the Board within a MAXIMUM of
how many days? - ANSWER-30 days

According to the Board Rules and Regulations, a full-time employee is one who
works a MINIMUM of how many hours per week? - ANSWER-30 hours.

A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net
worth of - ANSWER-$15,000.

According to the Board Rules and Regulations, which of the following could be a
qualified individual? - ANSWER-Any full-time employee.

An appeal of the local building official's decision to refuse to grant a modification to
the USBC MUST be made to the local building board within a MAXIMUM of how
many days? - ANSWER-90 days.

A building official MUST issue a certificate of occupancy for a building that meets all
the requirements for a certificate within a MAXIMUM of how many working days after
the certificate was requested? - ANSWER-5

, Additions to buildings MUST comply with - ANSWER-the current code for new
construction.

When MUST the work be stopped following the issuance of a stop work order? -
ANSWER-Immediately

Who is to be in charge of a local building department? - ANSWER-Building official.

Contractors who are assessed a fee to support the Transaction Recovery Fund
MUST pay this fee within a MINIMUM of how many days from when the assessment
fee notice was mailed? - ANSWER-45 days

Contractors will be assessed a fee for the Transaction Recovery Fund whenever the
fund balance is less than - ANSWER-$400,000.

Payments made by the Transaction Recovery Fund to claimants may include an
amount for - ANSWER-attorneys' fees.

A contract for which of the following types of structures may be subject to recovery
from the Transaction Recovery Fund? - ANSWER-Residential only.

A verified claim for payment from the Transaction Recovery Fund MUST occur within
a MAXIMUM of what period of time from the date the claimant was awarded a final
judgment? - ANSWER-12 months.

An appeal of a final decision of a county on an erosion control plan MUST be filed
within a MAXIMUM of how many days? - ANSWER-30 days.

Temporary erosion and sediment control measures MUST be removed within a
MAXIMUM of how many days after the final site stabilization? - ANSWER-30 days.

Which of the following statements about a sole proprietorship is TRUE? - ANSWER-
The business, or any part of it, can be sold, altered, or exchanged at will.

What type of business organization allows people to share financial resources? -
ANSWER-Partnership.

Which of the following estimating methods is typically used by the architect rather
than the contractor? - ANSWER-Conceptual estimate.

Equipment needs for a project are BEST estimated by - ANSWER-calculating the
number of hours or days it is needed.

What should be added to wage rates to ensure accuracy in estimating labor for a
project? - ANSWER-Labor burden.

A reason for using a lower than usual profit markup for a specific project could be to -
ANSWER-cover company overhead costs.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IMORA West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
190
Member since
2 year
Number of followers
77
Documents
5079
Last sold
3 days ago

4.4

69 reviews

5
49
4
8
3
8
2
1
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions