Process a material through GCSS- Army (Test B07)(2) Exam With Complete Answers.
What is required for work order for unit? - correct answer requires a part/ material What is Plant 2000? - correct answer Unit Plant 2001 - correct answer SSA MRP Area - correct answer Where material planning occurs Storage Location (SLoc) - correct answer SSA/Unit receives and Issues materials Warehouse - correct answer SSA material is picked or put away into storage bins What are first levels for ERP? - correct answer Basis of inventory management (IM) What are the last levels for ERP? - correct answer Basis for warehouse management (WM) STO Number - correct answer 71000 What does creation of STO trigger - correct answer Perform stock check in SSA Outbound delivery number - correct answer 80000xxxx When National - correct answer PO 45000
Written for
- Institution
- GCSS.
- Course
- GCSS.
Document information
- Uploaded on
- April 3, 2024
- Number of pages
- 1
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
process a material through gcss army test b072
Also available in package deal