FS questions and answers graded A+
FSIn differential leveling over long distances what effects must be taken into consideration? - correct answer 1. Curvature of the earth 2. Atmospheric refraction Lot 22 was conveyed in a subdivision on June 7, 1979 and Lot 23 was sold to the same person on June 8, 1979 - correct answer Lots 22 and 23 have equal rights within a recorded subdivision In Global Positioning System GPS survey procedures which is the most important measurement? - correct answer Antenna height The specifications for a survey require boundaries of a subdivision be referenced to spcs and referenced to grid north. You can obtain a list of control monuments and coordinates from? - correct answer National Geodetic Survey In a dependent survey in PLSS an obliterated corner is one whose location can be determined by? - correct answer reliable testimony The most effective way to link the proposed infrastructure of a development to the existing adjacent infrastructure is determined by? - correct answer A topographic survey A binary public file format used to interchange three-dimensional light detection and ranging data is called? - correct answer LAS (LASer) file The standard determination of the principle tidal datum in the U.S. is based on the average observations over a ______ year period? - correct answer 19 A warranty deed is an example of? - correct answer A title guarantee A road easement will be extinguished if which of the following occurs? - correct answer The dominant and servient tenement is under one ownership When performing project research it is necessary to review the historical recording dates of all deeds for the subject property and adjoining properties to determine: - correct answer order of conveyance What is the maximum number of CORS (Continuously Operating Reference Stations) that OPUS static (Online Positioning User Service) can use when processing a submitted GPS observation file? - correct answer 3 Geodetic heights obtained with satellite surveys are: - correct answer measured with respect to the ellipsoid When elevations are produced for a survey project using GNSS the limiting factor is a: - correct answer precise geoid model In a Lambert projection all the lines that are equal distance apart are: - correct answer standard parallels Misclosure vs survey length - correct answer Relative Accuracy One point vs datum (other points) - correct answer Network/Local accuracy Survey point group vs Error ellipse - correct answer Positional accuracy Precision shooting the same point again and again - correct answer Accuracy surveying the correct point Your measurements compared with an error eclipse - correct answer Positional accuracy The standard for reporting positional accuracy is defined in two components horizontal and vertical - correct answer The standard for the horizontal component as published by the NGS is the radius of a circle of uncertainty NGVD29 - correct answer National Geodetic Vertical Datum of 1929 Meade Ranch Kansas
Written for
- Institution
- Fundamentals of Surveying
- Course
- Fundamentals of Surveying
Document information
- Uploaded on
- March 25, 2024
- Number of pages
- 57
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
fs
-
in differential leveling over long distances what
-
lot 22 was conveyed in a subdivision on june 7 19
-
in global positioning system gps survey procedures
Also available in package deal