100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CDT Exam Prep 1-4 Questions With 100% Correct Answers 2024

Rating
-
Sold
-
Pages
36
Grade
A+
Uploaded on
20-03-2024
Written in
2023/2024

CDT Exam Prep 1-4 Questions With 100% Correct Answers 2024 Bidding documents are considered legal documents? ▪ True. ▪ False. - answerFalse Codes governing commercial construction and residential construction are different? ▪ True. ▪ False. - answerTrue The A/E usually hires a construction manager? - answerFalse The Owner, Contractor and A/E are parties to the construction agreement? ▪ True. ▪False. - answerFalse There are no differences between the AIA and EJCDC general conditions? ▪ True. ▪False. - answerFalse The drawings take precedence over the specifications? ▪ True. ▪False. - answerFalse The role of a subcontractor is the same as a material supplier? ▪ True. ▪ False. - answerFalse The supplementary conditions should be coordinated with the Owner/A/E agreement? ▪ True. ▪Fals - answerTrue nProject descriptions and outline specifications are legal and binding documents? ▪ True. ▪False - answerFalse nThe contractor and the A/E review submittals for the same reasons and from the same point of view? ▪ True. ▪False - answerF In 1964, the term "Project Manual" was introduced by the: A. American Bar Association. B. American Institute of Architects. C. Construction Specifications Institute. D. Department of Defense. - answerB Uniform Location of Subject Matterprepared by the EJCDC and jointly published by EJCDC and AIA provides a recommended location of topics in all of the following EXCEPT: A. Supplementary Conditions. B. Division 01. C. Agreement. D. Drawings. - answerD During the Planning/Pre-Design stage, the A/E may be retained to: A. Develop outline specifications. B. Describe the character of the mechanical system. C. Prepare renderings. D.Assist in financial feasibility studies - answerD During which project phase does the A/E review the Owner's program and budget requirements and suggest alternative approaches? A. Planning/Pre-Design. B. Design. C. Bidding/Negotiation. D. Construction. E. Post-Construction. - answerB A project's "life cycle" includes all of the following EXCEPT? A. Planning/Design. B. Financing. C. Construction. D. Evaluation. E. Demolition. - answerB nThe Specification-type document prepared during the Design Development phase is called the: A. Outline Specification. B. Rough Draft Specification. C. UniFormat Elements. - answerA nThe contractual relationship governed by the Conditions of the Contract is between: A. Owner and Contractor. B. A/E and Contractor. C. Owner and Subcontractors. D.A/E and Subcontractors. - answerA nThe Agreement: A. Establishes how the contract will be administered. B. Provides for requirements unique to a specific project. C. Protects the labor force if the Contractor fails to meet his obligations. D. Defines relationships and obligations between the Owner and Contractor. - answerD A disadvantage of using standardized agreement forms is: A. Familiarity of the forms. B. Uniformity of terminology. C. Legal precedents interpreting the documents. D. May not meet specific project requirements. E. Recognized customs resulting from longtime use. - answerD nThe "Contract Documents" typically include: A. Contract Forms. B. Contract Drawings. C. Specifications. D. Addenda. E.All of the above. - answerE As part of the _________, the Agreement is considered a Contract Document: A. Contract Conditions. B. Contract Forms. C. Bidding Requirements. D. Specifications. - answerB The Procurement Documents include all of the following EXCEPT: A. Procurement Requirements. B. Contract Modifications. C. Project Manual. D. Drawings. E.Addenda. - answerB All of the following are correct regarding procurement documents EXCEPT: A. Include all necessary procurement requirements. B. May include Owner-supplied bid forms. C. Become part of contract for construction. D. Identify other information available to bidders, such as land surveys. - answerC To be effective in communicating, specifications should be: A. Complete, concise, and correct. B. Concise, clear and correct. C. Clear, correct, complete and concise. D. Concise, correct and complete. - answerC Which of the following wo

Show more Read less
Institution
CDT
Course
CDT











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CDT
Course
CDT

Document information

Uploaded on
March 20, 2024
Number of pages
36
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
592
Member since
1 year
Number of followers
178
Documents
23586
Last sold
1 day ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

119 reviews

5
56
4
21
3
21
2
4
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions