IYRS Electrical ABYC Exam Correct Questions & Answers(RATED A+)
E - ANSWER Ball valves may be sealed to through hull fittings with: A. 5200 B. SikaFlex C. Teflon D. All the above E. None of the above B - ANSWER Tubes are measured by: A. ID B. OD C. nominal size C - ANSWER pipes may not be connected by: A. Welding B. Threaded fittings C. Compression fittings D. Glue C - ANSWER Tech A says Seacocks must be readily accessible. Tech B say its ok to have them within 12" of the engine. who is correct? A. Tech A B. Tech B C. Both D. neither D - ANSWER Tech A says that it is all right to connect an auxiliary line to the potable water pump as long as there is a siphon break. Technician B says you must have a lockable Y valve to prevent cross contamination. who is right? A. Tech A B. Tech B C. Both D. Neither D - ANSWER A bildge pump discharge line must be: A. equipped with a check valve t
Written for
- Institution
- ABYC
- Course
- ABYC
Document information
- Uploaded on
- March 16, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- iyrs electrical abyc
-
iyrs electrical abyc exam correct questions answ
-
the minimum amp circuit breaker that should be use
-
when testing for excessive emf emission near a con
Also available in package deal